Difference between revisions of "General Meeting Agenda 12/5/13"
Jump to navigation
Jump to search
(Created page with "ITEMS FOR DISCUSSION * NPS MRI PREPARATIONS") |
|||
Line 2: | Line 2: | ||
* NPS MRI PREPARATIONS | * NPS MRI PREPARATIONS | ||
+ | |||
+ | ::* Internal competitions | ||
+ | |||
+ | ::* Components | ||
+ | ::::* PMT+mag. shield, PMT voltage dividers, amplifiers (OU) | ||
+ | ::::* Magnet construction (ODU/OU) | ||
+ | ::::* Temperature controlled frame +cooling +motion (CUA) | ||
+ | ::::* Light monitoring system (CUA) | ||
+ | ::::* UV curing system (CUA) | ||
+ | |||
+ | ::* Draft (see email) |
Revision as of 13:18, 4 December 2013
ITEMS FOR DISCUSSION
- NPS MRI PREPARATIONS
- Internal competitions
- Components
- PMT+mag. shield, PMT voltage dividers, amplifiers (OU)
- Magnet construction (ODU/OU)
- Temperature controlled frame +cooling +motion (CUA)
- Light monitoring system (CUA)
- UV curing system (CUA)
- Draft (see email)