Difference between revisions of "Summary 2/3/20"
Jump to navigation
Jump to search
(Created page with "Notes by Charles Hyde •Summarize full to-do list in hall, and estimated time to completion •Estimate time for configuration changes during beam running •Document interfe...") |
|||
Line 1: | Line 1: | ||
Notes by Charles Hyde | Notes by Charles Hyde | ||
− | •Summarize full to-do list in hall, and estimated time to completion | + | :•Summarize full to-do list in hall, and estimated time to completion |
− | •Estimate time for configuration changes during beam running | + | :•Estimate time for configuration changes during beam running |
− | •Document interferences between NPS, BeamLine, HMS | + | :•Document interferences between NPS, BeamLine, HMS |
− | ••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022) | + | :••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022) |
− | • How is the Calorimeter, Cabling, etc assembled | + | :• How is the Calorimeter, Cabling, etc assembled |
Revision as of 09:33, 3 February 2020
Notes by Charles Hyde
- •Summarize full to-do list in hall, and estimated time to completion
- •Estimate time for configuration changes during beam running
- •Document interferences between NPS, BeamLine, HMS
- ••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022)
- • How is the Calorimeter, Cabling, etc assembled