Difference between revisions of "Summary 2/3/20"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
::•Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022) | ::•Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022) | ||
:• How is the Calorimeter, Cabling, etc assembled | :• How is the Calorimeter, Cabling, etc assembled | ||
+ | :•Do we run Sweep Magnet at full power or ~30%? | ||
+ | ::•DVCS, pi0 maybe OK at 30% power | ||
+ | ::•Future RCS will require full power (with NPS on outer side of SHMS) |
Revision as of 09:50, 3 February 2020
Notes by Charles Hyde
- •Summarize full to-do list in hall, and estimated time to completion
- •Estimate time for configuration changes during beam running
- •Document interferences between NPS, BeamLine, HMS
- •Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022)
- • How is the Calorimeter, Cabling, etc assembled
- •Do we run Sweep Magnet at full power or ~30%?
- •DVCS, pi0 maybe OK at 30% power
- •Future RCS will require full power (with NPS on outer side of SHMS)