Difference between revisions of "General Meeting Summary 3/26/20"

From Cuawiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
MAGNET (Charles)
+
'''MAGNET''' (Charles)
  
 
* Work on To-Do List items, e.g. checking measurement vs. 3D model is ongoing - see [https://wiki.jlab.org/cuawiki/images/2/2c/NPS-To-Do-List-2020-revised.pdf NPS To-Do List] for a complete listing
 
* Work on To-Do List items, e.g. checking measurement vs. 3D model is ongoing - see [https://wiki.jlab.org/cuawiki/images/2/2c/NPS-To-Do-List-2020-revised.pdf NPS To-Do List] for a complete listing
  
  
MECHANICAL DESIGN (Bogdan, Steven L.)
+
'''MECHANICAL DESIGN''' (Bogdan, Steven L.)
  
 
* Check and document all kinematics with latest requirements for interferences, e.g. shelf plates on SHMS and new experiment DVCS from Hall A
 
* Check and document all kinematics with latest requirements for interferences, e.g. shelf plates on SHMS and new experiment DVCS from Hall A
::* Action Item: collect and send the kinematics information to Steven L. (DVCS: Carlos/Charles, WACS/CPS: Bogdan/David H.)
+
::* '''Action Item:''' collect and send the kinematics information to Steven L. (DVCS: Carlos/Charles, WACS/CPS: Bogdan/David H.)
  
 
* Document time estimate for rotating the magnet, moving the NPS detector and cabling, moving NPS from one side to the other
 
* Document time estimate for rotating the magnet, moving the NPS detector and cabling, moving NPS from one side to the other
::* Action Item: develop possible models for cable layout - might need to get in touch with Brad and Jack
+
::* '''Action Item:''' develop possible models for cable layout - might need to get in touch with Brad and Jack
  
* Corrector magnet fit - Bogdan will work with Paulo on the details
+
* '''Action item:''' Corrector magnet fit - Bogdan will work with Paulo on the details
  
  
FRAME (Carlos)
+
'''FRAME''' (Carlos)
  
 
* Magnetic shield tests - note: max field expected is ~200 Gauss longitudinal
 
* Magnetic shield tests - note: max field expected is ~200 Gauss longitudinal
Line 28: Line 28:
  
  
CRYSTALS (Vladimir, Tanja)
+
'''CRYSTALS''' (Vladimir, Tanja)
  
 
* Crytur has been sending more crystals (50+10) over the last weeks - production seems to continue
 
* Crytur has been sending more crystals (50+10) over the last weeks - production seems to continue
::* Action Item: Check with CRYTUR if they can expedite outstanding crystal delivery for 250 crystals purchased recently and possible early FY21 procurement for 200 more
+
::* '''Action Item:''' Check with CRYTUR if they can expedite outstanding crystal delivery for 250 crystals purchased recently and possible early FY21 procurement for 200 more
 
* SICCAS shipped a number of crystals - arrival at JLab not yet known
 
* SICCAS shipped a number of crystals - arrival at JLab not yet known
  
  
HV DIVIDERS (Fernando, Alex S.)
+
'''HV DIVIDERS''' (Fernando, Alex S.)
  
 
* New HV dividers with additional amplification that improves linearity have been tested in Hall D and seem to perform well
 
* New HV dividers with additional amplification that improves linearity have been tested in Hall D and seem to perform well
* Action Items:
+
* '''Action Items:'''
::::* Collect results from Hall D and projected intensity of signals and performance for Hall A/C conditions
+
::* Collect results from Hall D and projected intensity of signals and performance for Hall A/C conditions
::::* Collect all information on Hall A/C projections, e.g. from Ho-San's simulations for discussion at next meeting
+
::* Collect all information on Hall A/C projections, e.g. from Ho-San's simulations for discussion at next meeting
  
  
Line 48: Line 48:
  
  
NEXT MEETING: THURSDAY 16 APRIL AT 9:00AM (ET)
+
'''NEXT MEETING: THURSDAY 16 APRIL AT 9:00AM (ET)
 +
'''

Latest revision as of 17:42, 26 March 2020

MAGNET (Charles)

  • Work on To-Do List items, e.g. checking measurement vs. 3D model is ongoing - see NPS To-Do List for a complete listing


MECHANICAL DESIGN (Bogdan, Steven L.)

  • Check and document all kinematics with latest requirements for interferences, e.g. shelf plates on SHMS and new experiment DVCS from Hall A
  • Action Item: collect and send the kinematics information to Steven L. (DVCS: Carlos/Charles, WACS/CPS: Bogdan/David H.)
  • Document time estimate for rotating the magnet, moving the NPS detector and cabling, moving NPS from one side to the other
  • Action Item: develop possible models for cable layout - might need to get in touch with Brad and Jack
  • Action item: Corrector magnet fit - Bogdan will work with Paulo on the details


FRAME (Carlos)

  • Magnetic shield tests - note: max field expected is ~200 Gauss longitudinal
  • measurements show that 0.5mm mu-metal works in that range of magnetic fields
  • initial measurements show that PMT signal in magnetic field drops faster than projected by the manufacturer - discussion about possible residual fields, which could cause this effect, also could lead to a transverse field.
  • Assembly of the frame started and was well underway until the lab shutdown on March 16 - anticipated delay roughly equal to length of closure
  • Crystals and LED connectors sent from JLab arrived in France - should be delivered at Orsay end of the week


CRYSTALS (Vladimir, Tanja)

  • Crytur has been sending more crystals (50+10) over the last weeks - production seems to continue
  • Action Item: Check with CRYTUR if they can expedite outstanding crystal delivery for 250 crystals purchased recently and possible early FY21 procurement for 200 more
  • SICCAS shipped a number of crystals - arrival at JLab not yet known


HV DIVIDERS (Fernando, Alex S.)

  • New HV dividers with additional amplification that improves linearity have been tested in Hall D and seem to perform well
  • Action Items:
  • Collect results from Hall D and projected intensity of signals and performance for Hall A/C conditions
  • Collect all information on Hall A/C projections, e.g. from Ho-San's simulations for discussion at next meeting


DISCUSSION (All)

  • NPS global delay likely a few months - will evaluate when Labs/Universities return to normal operations


NEXT MEETING: THURSDAY 16 APRIL AT 9:00AM (ET)