+ | '''ACTION ITEMS''' | ||
+ | |||
+ | * Analyze recent radiation simulation results | ||
+ | |||
+ | * Make an updated Hall A/C CPS sketch (new overall dimensions, weight) for Steve L. and team to check in the model. Make sure all CPS kinematics are available to the engineers/designers. Plan to discuss with the engineering team in April 17 meeting. | ||
+ | |||
+ | * Get suggested Hall D CPS configurations (Sean) | ||
+ | |||
+ | |||
+ | '''SUMMARY NOTES | ||
+ | ''' | ||
+ | * Radiation simulations (Gabriel) | ||
+ | ::* Pb configuration works in the backward region (<0cm) | ||
+ | ::* Tungsten seems the best option for the forward region, but some more tuning may be needed, e.g. more W laterally out to 70cm | ||
+ | ::::* See these [https://wiki.jlab.org/cuawiki/images/a/aa/CPS_next_phase.pdf CPS Next Phase] notes for guidance | ||
+ | ::* Tungsten may be down to ~1m3 | ||
+ | ::* Was there a low energy cut applied? What was it? | ||
+ | |||
+ | |||
+ | * Magnet and CPS design (Bogdan, Thia) | ||
+ | ::* Keeping all components on the pivot may be difficult - possible options were discussed with the engineering team. Should check in where they are. | ||
+ | |||
+ | ::* About 100 tons of lead are available from SLAC. Process has started to ship ~80 tons of lead to JLab. Discussion about storage ongoing with RADCon | ||
+ | |||
+ | * Hall D CPS | ||
+ | ::* Tagger area in Hall D: should be fine to move permanent magnet downstream and put CPS in that position | ||
+ | ::* Weight up to ~150 tons (few square meters) should be fine | ||
+ | ::* Need suggested configurations from Sean | ||
+ | |||
+ | * TCS: work on checking the impact of magnetic field on low energy (~100 MeV) particles is ongoing | ||
+ | |||
+ | |||
+ | '''NEXT MEETING: FRIDAY 17 APRIL AT 11:00AM (ET)''' |
Latest revision as of 10:27, 28 March 2020
DISCUSSION TOPICS
- Magnet and shielding
- Hall D updates
- Other
ACTION ITEMS
- Analyze recent radiation simulation results
- Make an updated Hall A/C CPS sketch (new overall dimensions, weight) for Steve L. and team to check in the model. Make sure all CPS kinematics are available to the engineers/designers. Plan to discuss with the engineering team in April 17 meeting.
- Get suggested Hall D CPS configurations (Sean)
SUMMARY NOTES
- Radiation simulations (Gabriel)
- Pb configuration works in the backward region (<0cm)
- Tungsten seems the best option for the forward region, but some more tuning may be needed, e.g. more W laterally out to 70cm
- See these CPS Next Phase notes for guidance
- Tungsten may be down to ~1m3
- Was there a low energy cut applied? What was it?
- Magnet and CPS design (Bogdan, Thia)
- Keeping all components on the pivot may be difficult - possible options were discussed with the engineering team. Should check in where they are.
- About 100 tons of lead are available from SLAC. Process has started to ship ~80 tons of lead to JLab. Discussion about storage ongoing with RADCon
- Hall D CPS
- Tagger area in Hall D: should be fine to move permanent magnet downstream and put CPS in that position
- Weight up to ~150 tons (few square meters) should be fine
- Need suggested configurations from Sean
- TCS: work on checking the impact of magnetic field on low energy (~100 MeV) particles is ongoing