Difference between revisions of "Meeting 2 October 2020"
Jump to navigation
Jump to search
(Created page with "DISCUSSION TOPICS * Simulations * Shielding and magnet model * Hall A/C model and design/implementation * Hall D design and radiation simulations * Other") |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
* Simulations | * Simulations | ||
+ | ::* [https://wiki.jlab.org/cuawiki/images/9/97/Pages_gn_mkIV_heat.pdf Power deposition from simulation] | ||
* Shielding and magnet model | * Shielding and magnet model | ||
+ | ::* [https://wiki.jlab.org/cuawiki/images/c/cc/CPS_Initial_Design_Model_10_02_20.pptx CPS Design Model Update] | ||
* Hall A/C model and design/implementation | * Hall A/C model and design/implementation | ||
Line 10: | Line 12: | ||
* Other | * Other | ||
+ | |||
+ | |||
+ | PARTICIPANTS: Amy Comer, Donal Day, Hamlet Mkrtchyan, Rolf Ent, Steven Lassiter, Vardan Tadevosyan, Tanja Horn, Bogdan Wojtsekhowski, Josh Crafts, Marie Boer, | ||
+ | |||
+ | |||
+ | '''SHIELDING MODELING''' (Josh) | ||
+ | |||
+ | * Magnet Shielding | ||
+ | ::* Thin shield on top - small thickness not an issue (~1% hole not an issue), overall not an issue as it's material, but not radiation issue for personnel - no one on top of CPS in operations | ||
+ | |||
+ | * Total weight of lead system | ||
+ | ::* ~3300 lead bricks (40 tons) - seems ~50% more than before, length is 2.7m compared to 2.1m originally | ||
+ | ::* ~2500 W bricks (4x4x2 inches3) - seems 20% more than before | ||
+ | |||
+ | * CPS Coil Cooling/Power Feeds | ||
+ | |||
+ | * Actions | ||
+ | ::* Check number of lead bricks and dimensions, same for W bricks | ||
+ | ::* Radiation hard coil model analysis | ||
+ | |||
+ | |||
+ | '''POWER DEPOSITION''' (Gabriel) | ||
+ | |||
+ | * Extracted power depositions from FLUKA - for now in arbitrary units (unspecified multiple of kW/cm3) and as function of horizontal coordinate y; radiator is at z~10cm | ||
+ | |||
+ | * Observe peak at z~24cm | ||
+ | |||
+ | * '''Action''': Next need to parameterize or extract heat deposition for each cell for input to thermal calculations | ||
+ | |||
+ | |||
+ | '''THERMAL CALCULATIONS''' (Amy) | ||
+ | |||
+ | * Model development complete | ||
+ | |||
+ | * '''Action''': determine the best input format from simulation (functional form in x, y, z or array?) | ||
+ | |||
+ | |||
+ | '''LEAD BRICKS''' (Bogdan) | ||
+ | |||
+ | * Shipment preparations ongoing - expect ~40tons before end of the year | ||
+ | |||
+ | |||
+ | '''OVERALL ACTIONS''' | ||
+ | * Start discussion about format and date for next collaboration meeting | ||
+ | |||
+ | |||
+ | '''NEXT MEETING: FRIDAY 30 OCTOBER AT 8AM (ET)''' |
Latest revision as of 09:45, 2 October 2020
DISCUSSION TOPICS
- Simulations
- Shielding and magnet model
- Hall A/C model and design/implementation
- Hall D design and radiation simulations
- Other
PARTICIPANTS: Amy Comer, Donal Day, Hamlet Mkrtchyan, Rolf Ent, Steven Lassiter, Vardan Tadevosyan, Tanja Horn, Bogdan Wojtsekhowski, Josh Crafts, Marie Boer,
SHIELDING MODELING (Josh)
- Magnet Shielding
- Thin shield on top - small thickness not an issue (~1% hole not an issue), overall not an issue as it's material, but not radiation issue for personnel - no one on top of CPS in operations
- Total weight of lead system
- ~3300 lead bricks (40 tons) - seems ~50% more than before, length is 2.7m compared to 2.1m originally
- ~2500 W bricks (4x4x2 inches3) - seems 20% more than before
- CPS Coil Cooling/Power Feeds
- Actions
- Check number of lead bricks and dimensions, same for W bricks
- Radiation hard coil model analysis
POWER DEPOSITION (Gabriel)
- Extracted power depositions from FLUKA - for now in arbitrary units (unspecified multiple of kW/cm3) and as function of horizontal coordinate y; radiator is at z~10cm
- Observe peak at z~24cm
- Action: Next need to parameterize or extract heat deposition for each cell for input to thermal calculations
THERMAL CALCULATIONS (Amy)
- Model development complete
- Action: determine the best input format from simulation (functional form in x, y, z or array?)
LEAD BRICKS (Bogdan)
- Shipment preparations ongoing - expect ~40tons before end of the year
OVERALL ACTIONS
- Start discussion about format and date for next collaboration meeting
NEXT MEETING: FRIDAY 30 OCTOBER AT 8AM (ET)