Difference between revisions of "General Meeting Agenda 3/27/14"
Jump to navigation
Jump to search
(Created page with "ITEMS FOR DISCUSSION: * NPS DESIGN * NPS PROTOTYPE TESTS * NPS ELECTRONICS TESTS") |
|||
(11 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
ITEMS FOR DISCUSSION: | ITEMS FOR DISCUSSION: | ||
− | * NPS DESIGN | + | * [https://wiki.jlab.org/cuawiki/images/2/23/NPS-status-27-march14.pdf NPS DESIGN and PROTOTYPE TEST STATUS] (Hamlet) |
− | * NPS | + | * NPS ELECTRONICS TESTS (Alexandre) |
− | + | Got the FADC trigger board this week. Have one FADC and VXS crate in test lab. Can start setting up. Need to follow up with Alexander Somov for borrowing a CTP. | |
+ | |||
+ | |||
+ | Quick look at effect of 4 ns jitter and 250 MHz on pulse shape. I took the PbF2 reference shape and summed over 4 ns, shifting by 1 ns, 2ns,3 ns and 4ns the start of the integral. It does not fluctuate as bad as I thought so trigger should work. To be tested with real hardware. | ||
+ | [[https://userweb.jlab.org/~camsonne/downsample.gif resumming of 1 GHz to 250 MHz]] | ||
+ | |||
+ | [[File:Downsample_(1).gif|800px|downsampling]] | ||
+ | |||
+ | Carlos is looking at elastic data to determine effect of lower sampling rate on energy resolution and timing, will show results maybe at next meeting. |
Latest revision as of 08:24, 27 March 2014
ITEMS FOR DISCUSSION:
- NPS DESIGN and PROTOTYPE TEST STATUS (Hamlet)
- NPS ELECTRONICS TESTS (Alexandre)
Got the FADC trigger board this week. Have one FADC and VXS crate in test lab. Can start setting up. Need to follow up with Alexander Somov for borrowing a CTP.
Quick look at effect of 4 ns jitter and 250 MHz on pulse shape. I took the PbF2 reference shape and summed over 4 ns, shifting by 1 ns, 2ns,3 ns and 4ns the start of the integral. It does not fluctuate as bad as I thought so trigger should work. To be tested with real hardware.
[resumming of 1 GHz to 250 MHz]
Carlos is looking at elastic data to determine effect of lower sampling rate on energy resolution and timing, will show results maybe at next meeting.