Difference between revisions of "General EEEMCal Meeting Summary 4/5/21"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
::* CORE is aiming for large area PWO coverage - endcap plus some of barrel | ::* CORE is aiming for large area PWO coverage - endcap plus some of barrel | ||
− | * '''ECCE SIMULATIONS MEETING''' (Rosi) | + | * '''ECCE SIMULATIONS MEETING''' (Rosi, Carlos) |
::* Kick off meeting to get people up and running on Fun4All | ::* Kick off meeting to get people up and running on Fun4All | ||
+ | ::* [https://indico.bnl.gov/event/11112/ Link to the Workshop including Fun4All tutorials] | ||
::* '''Action''': | ::* '''Action''': | ||
:::* EEEMCal needs to be implemented in Fun4All - Orsay team has started initial investigation | :::* EEEMCal needs to be implemented in Fun4All - Orsay team has started initial investigation | ||
Line 38: | Line 39: | ||
* '''PROTOTYPE TESTS''' (Douglas, Tanja) | * '''PROTOTYPE TESTS''' (Douglas, Tanja) | ||
− | ::* JLab tests expected starting August 23 and running into December 2021 (8 weeks + 7.5 weeks) - EEEMCAL anticipated to run ~3 weeks in the first period and ~4 weeks in the second period | + | ::* JLab tests expected starting August 23 and running into December 2021 (8 weeks + 7.5 weeks) - EEEMCAL anticipated to run ~3 weeks in the first period and ~4 weeks in the second period. For more information on all planned prototype tests at JLab see [https://docs.google.com/spreadsheets/d/1hGN3OqBCs6WUoWJA4jrhVXYVzkBbX4oMkC9Iy3LvWPY/edit#gid=0 this link] |
− | Period 1: | + | :::*Period 1: |
− | mRICH + GEMTRD/MPGD | + | ::::* mRICH + GEMTRD/MPGD |
− | EEEMCal1 + GEMTRD/MPGD | + | ::::* EEEMCal1 + GEMTRD/MPGD |
− | OTRFT + GEMTRD/MPGD | + | ::::* OTRFT + GEMTRD/MPGD |
− | Period 2: | + | :::* Period 2: |
− | OTRFT + GEMTRD/MPGD | + | ::::* OTRFT + GEMTRD/MPGD |
− | EEEMCal2 (+ GEMTRD/MPGD pending further discussions) | + | ::::* EEEMCal2 (+ GEMTRD/MPGD pending further discussions) |
− | EEEMCal3/TPEX 5x5 | + | ::::* EEEMCal3/TPEX 5x5 |
::* DESY tests being planned for fall 2021 - expect ~2 weeks EEEMCal tests (streaming readout - test different boards) | ::* DESY tests being planned for fall 2021 - expect ~2 weeks EEEMCal tests (streaming readout - test different boards) | ||
− | ::* Workshop on streaming readout at end of April | + | ::* Workshop on streaming readout at end of April - Douglas will send out more information |
* '''Discussion Research outline''' (all) | * '''Discussion Research outline''' (all) |
Latest revision as of 12:27, 5 April 2021
PARTICIPANTS: Hamlet, Tanja, Gabriel, Carlos, Cristiano, Rosi, Douglas, Admin, Renee, Hrachya, Lei, Vardan, Richard, Miroslav
JMU INTRODUCTION (Gabriel Niculescu)
- Large undergrad serving institution
- Long track record in hadron physics
- Expertise: simulations, designing, building, and testing detectors and detector components (PMTs mostly)
UPDATES FROM ECCE, EICIP6, IR2, CORE, etc.
- CORE (Carlos)
- invited for presentation on PWO
- CORE is aiming for large area PWO coverage - endcap plus some of barrel
- ECCE SIMULATIONS MEETING (Rosi, Carlos)
- Kick off meeting to get people up and running on Fun4All
- Link to the Workshop including Fun4All tutorials
- Action:
- EEEMCal needs to be implemented in Fun4All - Orsay team has started initial investigation
- EIC@IP6 INSTITUTIONAL BOARD (All)
- Starting to assemble institutional board
- Will have frequent meetings
- Actions:
- EEEMCal nominate a calorimeter convener
- Institutional board meeting representative for EEEMCal: Renee
- Fill out spreadsheet: check RECAL, under hardware interests: "EM Calorimeter (EEEMCAL)"
- SUPPORT STRUCTURE (Tanja)
- Invited to a meeting on 3D model/visualization of detector organized by the project. The general aim to define outer structures for the electron endcap calorimeter (support/mounting points, integration with DIRC readout)
- Josh Crafts (student/tech at CUA) presented the CAD model of the Hall D FCAL as a possible starting point for the electron endcap calorimeter support structure
- Action:
- check on EEEMCAL participation in future 3D model/visualization meetings
- SIMULATIONS (Cristiano)
- Implementation of EEEMCAL in simulations ongoing or complete (ESCALATE, FUN4ALL)
- Optimization implemented in Escalate - on top of the simulation - that pipeline is basically ready
- PROTOTYPE TESTS (Douglas, Tanja)
- JLab tests expected starting August 23 and running into December 2021 (8 weeks + 7.5 weeks) - EEEMCAL anticipated to run ~3 weeks in the first period and ~4 weeks in the second period. For more information on all planned prototype tests at JLab see this link
- Period 1:
- mRICH + GEMTRD/MPGD
- EEEMCal1 + GEMTRD/MPGD
- OTRFT + GEMTRD/MPGD
- Period 2:
- OTRFT + GEMTRD/MPGD
- EEEMCal2 (+ GEMTRD/MPGD pending further discussions)
- EEEMCal3/TPEX 5x5
- DESY tests being planned for fall 2021 - expect ~2 weeks EEEMCal tests (streaming readout - test different boards)
- Workshop on streaming readout at end of April - Douglas will send out more information
- Discussion Research outline (all)
- Action:
- each group look over and tweak as needed
- Add paragraph at the end to make clear that aware of proposal initiatives and how EEEMCal would fit into each; engagement in these detector proposals
NEXT MEETING: MONDAY 19 APRIL AT 8:30AM ET