Difference between revisions of "General Meeting Summary 1/5/23"

From Cuawiki
Jump to navigation Jump to search
(Created page with "PARTICIPANTS: Paulo Medeiros, Hamlet Mkrtchyan, Bogdan Wojtsekhowski, Tanja Horn, Pramita Tiwari, Deb Biswas, Carlos Munoz-Camacho, Julie Roche, Gyang Chung, Hakob Voskanyan,...")
 
 
Line 1: Line 1:
PARTICIPANTS: Paulo Medeiros, Hamlet Mkrtchyan, Bogdan Wojtsekhowski, Tanja Horn, Pramita Tiwari, Deb Biswas, Carlos Munoz-Camacho, Julie Roche, Gyang Chung, Hakob Voskanyan, Vardan Tadevosyan, Rolf Ent, Steven Lassiter, Yeran Ghandilyan,
+
PARTICIPANTS: Paulo Medeiros, Hamlet Mkrtchyan, Bogdan Wojtsekhowski, Tanja Horn, Pramita Tiwari, Deb Biswas, Carlos Munoz-Camacho, Julie Roche, Gyang Chung, Hakob Voskanyan, Vardan Tadevosyan, Rolf Ent, Steven Lassiter, Yeran Ghandilyan,  
  
  
STATUS UDPATES DETECTOR
+
'''STATUS UDPATES DETECTOR'''
  
    Detector has been on and data acquired - being analyzed
+
* Detector has been on and data acquired - being analyzed
  
    Capacitors for addressing noise/oscillation issue in HV dividers being fabricated - should be ready for French team arrival (on Monday 1/9)
+
* Capacitors for addressing noise/oscillation issue in HV dividers being fabricated - should be ready for French team arrival (on Monday 1/9)
  
    cable arrangement ongoing with mechanical design/engineering team
+
* cable arrangement ongoing with mechanical design/engineering team
  
  
MECHANICAL (Paulo, Steven L)
+
'''MECHANICAL''' (Paulo, Steven L)
  
    coil quote arrived for the corrector magnet  
+
* coil quote arrived for the corrector magnet  
  
    working on cable guides (see above)
+
* working on cable guides (see above)
  
    announcement that will start weekly meetings with designers and work coordinator for installation work
+
* announcement that will start weekly meetings with designers and work coordinator for installation work
 +
  
 +
'''DISCUSSION COLLABORATION MEETING AGENDA
 +
'''
 +
* Overall format: hybrid with in-person component at JLab and remote participation option
 +
::* Action: check if people can travel to JLab
  
DISCUSSION COLLABORATION MEETING AGENDA
+
* Time table: Two days (2 and 3 February) from 8am to 1pm ET
  
    Overall format: hybrid with in-person component at JLab and remote participation option
+
* Agenda overview
 +
::* Day 1: Status of the NPS - making the detector - and new physics with NPS
 +
::* Day 2: Installation, checkout with beam, run plan, and preparation for the final readiness review
  
            Action: check if people can travel to JLab
+
* Agenda details
 +
::* Re-organize agenda presently on wiki in format above
 +
::* Add physics talks on strange form factors (Bogdan) and DDVCS/TCS (Marie, Vardan, Deb, et al.)
 +
::* Commissioning of magnet and beamline should be part of the checkout with beam discussion
 +
::* Elastic commissioning should be part of the checkout with beam discussion
 +
::* Talk on trigger should be by FEG
 +
::* Talk on DAQ/electronics to complement it  should also be part of the detector status updates session
 +
::* This is the last meeting before the run, so should have an extended discussion on preparing for the run
  
    Time table: Two days (2 and 3 February) from 8am to 1pm ET
+
* Speakers for the detector updates will be contacted
  
    Agenda overview
+
* Day 2 discussion will be organized by the DVCS and SIDIS spokespersons team
 +
::* slides with bullet points can be provided on specific topics, e.g., polarimeter, magnet (what needs to be done, power supply, etc.)
 +
::* elastic checkout - Julie can provide a name for this part of the discussion
  
            Day 1: Status of the NPS - making the detector - and new physics with NPS
+
* '''Action items''':
            Day 2: Installation, checkout with beam, run plan, and preparation for the final readiness review
+
::* re-organize collaboration meeting agenda and send out (Tanja)
 +
::* contact detector status updates speakers
 +
::* start an email discussion with DVCS/SIDIS spokespersons to work out the details of the Day 2 discussions
 +
::* contact people about bullet lists
  
    Agenda details
 
  
            Re-organize agenda presently on wiki in format above
+
'''NEXT MEETING: COLLABORATION MEETING 2-3 FEBRUARY 8AM - 1PM ET
            Add physics talks on strange form factors (Bogdan) and DDVCS/TCS (Marie, Vardan, Deb, et al.)
+
'''
            Commissioning of magnet and beamline should be part of the checkout with beam discussion
 
            Elastic commissioning should be part of the checkout with beam discussion
 
            Talk on trigger should be by FEG
 
            Talk on DAQ/electronics to complement it should also be part of the detector status updates session
 
            This is the last meeting before the run, so should have an extended discussion on preparing for the run
 
 
 
    Speakers for the detector updates will be contacted
 
 
 
    Day 2 discussion will be organized by the DVCS and SIDIS spokespersons team
 
 
 
            slides with bullet points can be provided on specific topics, e.g., polarimeter, magnet (what needs to be done, power supply, etc.)
 
            elastic checkout - Julie can provide a name for this part of the discussion
 
 
 
    Action items:
 
 
 
            re-organize collaboration meeting agenda and send out (Tanja)
 
            contact detector status updates speakers
 
            start an email discussion with DVCS/SIDIS spokespersons to work out the details of the Day 2 discussions
 
            contact people about bullet lists
 
 
 
 
 
NEXT MEETING: COLLABORATION MEETING 2-3 FEBRUARY 8AM - 1PM ET
 

Latest revision as of 11:57, 23 February 2023

PARTICIPANTS: Paulo Medeiros, Hamlet Mkrtchyan, Bogdan Wojtsekhowski, Tanja Horn, Pramita Tiwari, Deb Biswas, Carlos Munoz-Camacho, Julie Roche, Gyang Chung, Hakob Voskanyan, Vardan Tadevosyan, Rolf Ent, Steven Lassiter, Yeran Ghandilyan,


STATUS UDPATES DETECTOR

  • Detector has been on and data acquired - being analyzed
  • Capacitors for addressing noise/oscillation issue in HV dividers being fabricated - should be ready for French team arrival (on Monday 1/9)
  • cable arrangement ongoing with mechanical design/engineering team


MECHANICAL (Paulo, Steven L)

  • coil quote arrived for the corrector magnet
  • working on cable guides (see above)
  • announcement that will start weekly meetings with designers and work coordinator for installation work


DISCUSSION COLLABORATION MEETING AGENDA

  • Overall format: hybrid with in-person component at JLab and remote participation option
  • Action: check if people can travel to JLab
  • Time table: Two days (2 and 3 February) from 8am to 1pm ET
  • Agenda overview
  • Day 1: Status of the NPS - making the detector - and new physics with NPS
  • Day 2: Installation, checkout with beam, run plan, and preparation for the final readiness review
  • Agenda details
  • Re-organize agenda presently on wiki in format above
  • Add physics talks on strange form factors (Bogdan) and DDVCS/TCS (Marie, Vardan, Deb, et al.)
  • Commissioning of magnet and beamline should be part of the checkout with beam discussion
  • Elastic commissioning should be part of the checkout with beam discussion
  • Talk on trigger should be by FEG
  • Talk on DAQ/electronics to complement it should also be part of the detector status updates session
  • This is the last meeting before the run, so should have an extended discussion on preparing for the run
  • Speakers for the detector updates will be contacted
  • Day 2 discussion will be organized by the DVCS and SIDIS spokespersons team
  • slides with bullet points can be provided on specific topics, e.g., polarimeter, magnet (what needs to be done, power supply, etc.)
  • elastic checkout - Julie can provide a name for this part of the discussion
  • Action items:
  • re-organize collaboration meeting agenda and send out (Tanja)
  • contact detector status updates speakers
  • start an email discussion with DVCS/SIDIS spokespersons to work out the details of the Day 2 discussions
  • contact people about bullet lists


NEXT MEETING: COLLABORATION MEETING 2-3 FEBRUARY 8AM - 1PM ET