Difference between revisions of "Pictures"

From Cuawiki
Jump to navigation Jump to search
(23 intermediate revisions by the same user not shown)
Line 1: Line 1:
NPS Assembly
+
NPS installation in Hall C - April 2023
 
<gallery>
 
<gallery>
  
IMG 8918.JPG|1
+
NPS-04062023-roofblock-cutting-1.jpg|1 Roof block cutting
 +
NPS-04062023-platform-installation-1.jpg|2 Platform installation
 +
NPS-04062023-platform-installation-1.jpg|3 Platform installation
 +
NPS IMG 4284.jpg|4
 +
NPS IMG 4282.jpg|5
 +
NPS IMG 4281.jpg|6
 +
IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 104841 1682003809853.JPEG|8 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 110819 1682004194220.JPEG|9 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 112123 1682004121617.JPEG|10 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 111956 1682004141662.JPEG|11 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 1675.JPG|12 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1677.JPG|13 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1679.JPG|14 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
 
 +
 
 +
</gallery>
 +
 
 +
 
 +
 
 +
NPS pre-installation tests in EEL108 - February/March 2023
 +
<gallery>
 +
 
 +
IMG 6620.jpg|1
 +
IMG 6621.jpg|2
 +
IMG 6622.jpg|3
 +
IMG 6624.jpg|4
 +
IMG 6625.jpg|5
 +
IMG 6626.jpg|6
 +
IMG 6628.jpg|7
 +
IMG 6630.jpg|8
 +
 
 +
 
 +
</gallery>
 +
 
 +
 
 +
NPS Assembly - January 2023
 +
<gallery>
 +
 
 +
20220615 115236.jpg|1
 
20230123 072926.jpg|2
 
20230123 072926.jpg|2
 +
IMG 8918.JPG|3
 +
NPS-assembly-with-PCBs-PMT-maintenance.png|4
 +
NPS-assembly-with-PCBs.png|5
 +
NPS-assembly-with-PCBs-side-closeup.png|6
 +
NPS-assembly-with-PCBs-side-closeup-2.png|7
 +
Nps0.jpeg|8
 +
 +
</gallery>
 +
 +
 +
NPS Support on SHMS - trial installation in 2022
 +
 +
<gallery>
 +
 +
PXL 20220411 120808862.jpg|1
 +
PXL 20220411 120822182.jpg|2
 +
PXL 20220411 120827670.jpg|3
 +
PXL 20220411 121007212.jpg|4
 +
PXL 20220411 121011251.jpg|5
 +
PXL 20220411 121022788.jpg|6
 +
IMG 0177.jpg|7
 +
IMG 0176.jpg|8
 +
IMG 0172.jpg|9
 +
IMG 0173.jpg|10
 +
IMG 0171.jpg|11
 +
IMG 0162.jpg|12
 +
IMG 0112.jpg|13
 +
IMG 0111.jpg|14
 +
IMG 0097.jpg|15
 +
 +
</gallery>
 +
 +
 +
Crystal Reflector Preparation
 +
 +
<gallery>
 +
 +
IMG 2647.jpg|1
 +
IMG 2646.jpg|2
 +
 +
 +
</gallery>
 +
 +
Conceptual drawing of the NPS detector - CUA undergrad student (2017)
 +
<gallery>
 +
 +
Calorimeter2.bmp
  
 
</gallery>
 
</gallery>

Revision as of 15:49, 8 May 2023

NPS installation in Hall C - April 2023


NPS pre-installation tests in EEL108 - February/March 2023


NPS Assembly - January 2023


NPS Support on SHMS - trial installation in 2022


Crystal Reflector Preparation

Conceptual drawing of the NPS detector - CUA undergrad student (2017)