Difference between revisions of "Pictures"

From Cuawiki
Jump to navigation Jump to search
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
<gallery>
 
<gallery>
  
NPS-04062023-roofblock-cutting-1.jpg|1
+
NPS-04062023-roofblock-cutting-1.jpg|1 Roof block cutting
NPS-04062023-platform-installation-1.jpg|2
+
NPS-04062023-platform-installation-1.jpg|2 Platform installation
NPS-04062023-platform-installation-1.jpg|3
+
NPS-04062023-platform-installation-1.jpg|3 Platform installation
 +
NPS IMG 4284.jpg|4
 +
NPS IMG 4282.jpg|5
 +
NPS IMG 4281.jpg|6
 +
IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 104841 1682003809853.JPEG|8 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 110819 1682004194220.JPEG|9 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 112123 1682004121617.JPEG|10 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 111956 1682004141662.JPEG|11 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 1675.JPG|12 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1677.JPG|13 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1679.JPG|14 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
  
 +
 +
</gallery>
  
  
</gallery>
 
  
NPS pre-installation tests in EEL108 - February 2023
+
NPS pre-installation tests in EEL108 - February/March 2023
 
<gallery>
 
<gallery>
  

Revision as of 15:49, 8 May 2023

NPS installation in Hall C - April 2023


NPS pre-installation tests in EEL108 - February/March 2023


NPS Assembly - January 2023


NPS Support on SHMS - trial installation in 2022


Crystal Reflector Preparation

Conceptual drawing of the NPS detector - CUA undergrad student (2017)