(Created page with "DISCUSSION MATERIAL - NPS REMOVAL 2024 * NPS Removal Rev C [https://wiki.jlab.org/cuawiki/images/e/ef/NPS_removal_RevC.pdf Plan from S. Lassiter] * JLab Site Plan Detail [ht...")
 
 
Line 1: Line 1:
 
DISCUSSION MATERIAL - NPS REMOVAL 2024
 
DISCUSSION MATERIAL - NPS REMOVAL 2024
  
* NPS Removal Rev C [https://wiki.jlab.org/cuawiki/images/e/ef/NPS_removal_RevC.pdf Plan from S. Lassiter]
+
* NPS Removal Rev D [https://wiki.jlab.org/cuawiki/images/f/f5/NPS_removal_RevD.pdf Plan from S. Lassiter (with updates from March 7 meeting)]
  
* JLab Site Plan Detail [https://wiki.jlab.org/cuawiki/images/1/18/JLAB_site_plan_detail.pdf Image]
+
* NPS Component Storage in the JLab Site Plan Detail [https://wiki.jlab.org/cuawiki/images/1/18/JLAB_site_plan_detail.pdf Image]
 +
::* The Magnet will go to the test lab, by CLEO magnet. (58)
 +
::* calorimeter will go into the ESB. (23)
 +
::* Cables may go into PSB. (72)
 +
::* the majority of the rest will go into a Fabric housing near the canon gate. (64)

Latest revision as of 15:25, 26 March 2024

DISCUSSION MATERIAL - NPS REMOVAL 2024

  • NPS Component Storage in the JLab Site Plan Detail Image
  • The Magnet will go to the test lab, by CLEO magnet. (58)
  • calorimeter will go into the ESB. (23)
  • Cables may go into PSB. (72)
  • the majority of the rest will go into a Fabric housing near the canon gate. (64)