Difference between revisions of "EIC-10-April-24-minutes"

From Cuawiki
Jump to navigation Jump to search
Line 11: Line 11:
 
* E. Sidoretti: the DAQ is not working: it does not compile at the moment.  
 
* E. Sidoretti: the DAQ is not working: it does not compile at the moment.  
  
* A. D'Angelo: a GEM foil has been ordered to Rui.  
+
* A. D'Angelo: news for the orders and for the coordination.
 
+
** a GEM foil has been ordered to Rui. 2D detectors will be ordered as well. 
 +
** The Temple University, Matt Posik, is available to build the two leptonic disks (he presented a talk during Thursday meeting).  A coordination with Matt is needed. The main difference is in the engineering. The hadronic disks have a greater hole in the middle.
  
 
</ol>
 
</ol>

Revision as of 04:53, 10 April 2024

Meeting report for ePIC-EIC Roma2, April 10, 2024

Coordination Meeting

    Attending: B. Benkel, A. D'Angelo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti.
  1. General Points:
    • E. Sidoretti: the DAQ is not working: it does not compile at the moment.
    • A. D'Angelo: news for the orders and for the coordination.
      • a GEM foil has been ordered to Rui. 2D detectors will be ordered as well.
      • The Temple University, Matt Posik, is available to build the two leptonic disks (he presented a talk during Thursday meeting). A coordination with Matt is needed. The main difference is in the engineering. The hadronic disks have a greater hole in the middle.


Back to the wikipage
Go to next meeting
Go to previous meeting