Difference between revisions of "EIC-29-May-24-minutes"
Jump to navigation
Jump to search
(Created page with "Meeting report for ePIC-EIC Roma2, May 29, 2024 <font color="red"><b>Coordination Meeting</b></font> <br> <ol> Attending: B. Benkel, A. D'Angelo, R. Di Salvo, A. Fantini,...") |
|||
Line 6: | Line 6: | ||
Attending: | Attending: | ||
− | B. Benkel, A. D'Angelo, R. Di Salvo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi. | + | R. Ammendola, B. Benkel, A. D'Angelo, R. Di Salvo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi. |
<li> <font color="green"><b>General Points</b></font>:<br> | <li> <font color="green"><b>General Points</b></font>:<br> | ||
* A. D'Angelo: list of material needed for the test beam that will take place in the Fall is reported. | * A. D'Angelo: list of material needed for the test beam that will take place in the Fall is reported. | ||
+ | |||
+ | |||
+ | [[Image:|thumb|center]] | ||
+ | |||
</ol> | </ol> |
Revision as of 04:11, 29 May 2024
Meeting report for ePIC-EIC Roma2, May 29, 2024
Coordination Meeting
-
Attending:
R. Ammendola, B. Benkel, A. D'Angelo, R. Di Salvo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi.
- General Points:
- A. D'Angelo: list of material needed for the test beam that will take place in the Fall is reported.
Back to the wikipage
Go to next meeting
Go to previous meeting