Difference between revisions of "EIC-17-July-24-minutes"

From Cuawiki
Jump to navigation Jump to search
(Created page with "Meeting report for ePIC-EIC Roma2, July 17, 2024 <font color="red"><b>Coordination Meeting</b></font> <br> <ol> Attending: M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, E....")
 
 
(4 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
Attending:  
 
Attending:  
  
M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti.
+
M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti, L. Torlai.
  
 
<li> <font color="green"><b>General Points</b></font>:<br>
 
<li> <font color="green"><b>General Points</b></font>:<br>
  
* A. D'Angelo: E. Sidoretti has performed first tests using different configurations for the chamber.
+
* A. D'Angelo: E. Sidoretti has performed first tests using different configurations in HV for the muRwell chamber. MuTPC mode worked well. JLAB12 - TendiGEM, xray chamber and 50x50 gem chamber (hilumi upgrade). EIC requests are for detectors with a 500 mum pitch if possible, 2000 channels.
  
 
</ol>
 
</ol>

Latest revision as of 04:59, 17 July 2024

Meeting report for ePIC-EIC Roma2, July 17, 2024

Coordination Meeting

    Attending: M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti, L. Torlai.
  1. General Points:
    • A. D'Angelo: E. Sidoretti has performed first tests using different configurations in HV for the muRwell chamber. MuTPC mode worked well. JLAB12 - TendiGEM, xray chamber and 50x50 gem chamber (hilumi upgrade). EIC requests are for detectors with a 500 mum pitch if possible, 2000 channels.


Back to the wikipage
Go to next meeting
Go to previous meeting