Difference between revisions of "General EEEMCal Meeting Summary 12/13/24"

From Cuawiki
Jump to navigation Jump to search
(Created page with "Back to Meeting Main Page --> [https://wiki.jlab.org/cuawiki/index.php/EEEMCal_Meetings Meeting Main]")
 
 
Line 1: Line 1:
 
Back to Meeting Main Page --> [https://wiki.jlab.org/cuawiki/index.php/EEEMCal_Meetings Meeting Main]
 
Back to Meeting Main Page --> [https://wiki.jlab.org/cuawiki/index.php/EEEMCal_Meetings Meeting Main]
 +
 +
PARTICIPANTS: Hamlet, Carlos, Douglas, Tanja, Josh, Justin, Vardan, Nathan, Ethan,
 +
 +
 +
'''OVERVIEW OF 2025 PROTOTYPE BEAM TEST PLANS'''
 +
 +
[https://wiki.jlab.org/cuawiki/images/f/fb/EEEMCAL-meeting-12132024.pdf Link to slides]
 +
 +
* Three slots at DESY have been scheduled - all for 2 weeks
 +
::* 17 February following a maintenance period. Goal: comparison of readout chains with Orsay prototype
 +
::* 24 March - no maintenance period - so need to count half a day for setup. Goal: comparison of PMT and SIPM with MIT prototype; CRYTUR prototype
 +
::* 9 June - contingency
 +
 +
* At JLab EEEMCAL has an opportunity for a parasitic test in Hall D in June/July 2025
 +
 +
* For the DESY test please send names of participants to Douglas (hasell@mit.edu) as soon as possible
 +
 +
* ''Action items'':
 +
::* explore if JLab EEEMCAL test could be sooner in the year
 +
 +
 +
'''PREPARATIONS FOR 2025 PROTOTYPE BEAM TESTS'''
 +
 +
* Orsay and MIT prototypes are ready
 +
 +
* For the discrete readout boards
 +
::* Larry has assembled three full setups. He will send one with a 2x2 6015 SiPM board, adapter connectors, prototype pre-amp board, and power cable to Gerard for testing at IU. The signal output is an MCX connector.
 +
::* Gerard will report on the tests early next week.
 +
::* Gerard is planning to submit a request for fabrication of the boards to JLab by 19 December
 +
 +
* For the JLab prototype tests need to find out how to integrate the Orsay prototype with the Hall D DAQ
 +
::* Action item: connect with Vladimir and Sasha S. about that
 +
 +
* '''Action items''':
 +
::* Submit request for discrete readout board fabrication to JLab (Gerard/Larry)
 +
::* Schedule a meeting with Vladimir/Sasha
 +
 +
 +
'''PRE-TDR'''
 +
 +
* The EEEMCAL part was updated and submitted on 12/6. A commenting period is now open
 +
 +
* Further discussion including possibly updated timeline is planned for the ePIC collaboration meeting in January 2025
 +
 +
 +
'''MECHANICAL'''
 +
 +
* There have been some discussions about the outer shape of the EEEMCAL. Julien can update on that later.
 +
 +
 +
'''NEXT MEETING: FRIDAY 10 JANUARY 2025 AT 8:00AM ET'''

Latest revision as of 15:27, 13 December 2024

Back to Meeting Main Page --> Meeting Main

PARTICIPANTS: Hamlet, Carlos, Douglas, Tanja, Josh, Justin, Vardan, Nathan, Ethan,


OVERVIEW OF 2025 PROTOTYPE BEAM TEST PLANS

Link to slides

  • Three slots at DESY have been scheduled - all for 2 weeks
  • 17 February following a maintenance period. Goal: comparison of readout chains with Orsay prototype
  • 24 March - no maintenance period - so need to count half a day for setup. Goal: comparison of PMT and SIPM with MIT prototype; CRYTUR prototype
  • 9 June - contingency
  • At JLab EEEMCAL has an opportunity for a parasitic test in Hall D in June/July 2025
  • For the DESY test please send names of participants to Douglas (hasell@mit.edu) as soon as possible
  • Action items:
  • explore if JLab EEEMCAL test could be sooner in the year


PREPARATIONS FOR 2025 PROTOTYPE BEAM TESTS

  • Orsay and MIT prototypes are ready
  • For the discrete readout boards
  • Larry has assembled three full setups. He will send one with a 2x2 6015 SiPM board, adapter connectors, prototype pre-amp board, and power cable to Gerard for testing at IU. The signal output is an MCX connector.
  • Gerard will report on the tests early next week.
  • Gerard is planning to submit a request for fabrication of the boards to JLab by 19 December
  • For the JLab prototype tests need to find out how to integrate the Orsay prototype with the Hall D DAQ
  • Action item: connect with Vladimir and Sasha S. about that
  • Action items:
  • Submit request for discrete readout board fabrication to JLab (Gerard/Larry)
  • Schedule a meeting with Vladimir/Sasha


PRE-TDR

  • The EEEMCAL part was updated and submitted on 12/6. A commenting period is now open
  • Further discussion including possibly updated timeline is planned for the ePIC collaboration meeting in January 2025


MECHANICAL

  • There have been some discussions about the outer shape of the EEEMCAL. Julien can update on that later.