Difference between revisions of "Meeting 1 November 2019"

From Cuawiki
Jump to navigation Jump to search
 
Line 6: Line 6:
 
ACTION ITEMS:
 
ACTION ITEMS:
  
* (David H., Sean, Tanja) Finalize CPS article - target for submission: 22 November
+
* (David H., Sean, Rolf, Donal, Tanja, ...) Finalize CPS article - target for submission: 22 November
 
::* implement comments from Sean and Donal
 
::* implement comments from Sean and Donal
 
::* check figure captions
 
::* check figure captions
Line 12: Line 12:
 
::* author list
 
::* author list
  
* Simulations in preparation for NSF MRI
+
* (Gabriel) Simulations in preparation for NSF MRI
 
::* need radiation analysis on coil to determine what isolation material to use - for specific simulation specs see item 4a from 10/11 meeting (need one z-value)
 
::* need radiation analysis on coil to determine what isolation material to use - for specific simulation specs see item 4a from 10/11 meeting (need one z-value)
 
::* need some phi angles to see how much shielding to use - also item 4a
 
::* need some phi angles to see how much shielding to use - also item 4a
  
* Funding proposal
+
* (David H., Tanja) Funding proposal
 
::* prepare an itemized budget for discussion
 
::* prepare an itemized budget for discussion
 
::* prepare 1-2 page on CPS for David H funding proposal submission
 
::* prepare 1-2 page on CPS for David H funding proposal submission
Line 24: Line 24:
  
 
DETAILS OF THE DISCUSSION
 
DETAILS OF THE DISCUSSION
 +
 +
* CPS simulation update - step 0 is complete!
 +
::* Comparison of Parker Reid to Gabriel Niculescu simulations - they are consistent
 +
::* details of the simulations:
 +
::::* both based on cylindrical geometry
 +
::::* horizontal axis is the beam direction
 +
::::* vertical axis is transverse to beam direction AND integrated over all phi angles
 +
::* should still figure out what the events in the indicated box are - strange since no material there
 +
 +
 +
* Discussion about next steps for simulation
 +
::* Insert intermediate steps before step 1 to determine material needed for CPS and cost estimate for funding proposal
 +
::::* complete step 4a for one z-value, factor 3 sufficient - choice of material
 +
::::* need phi angles bins - amount of shielding, radiation going into floor etc.
 +
::* step 1 involves comparison to an Hall C experiment, e.g. J/Psi, to verify activation after 1000 hours running etc.
 +
 +
 +
* Discussion about beam size in Hall D
 +
::* 10% radiator - take half the size (5%) and assume 11-12 GeV in Hall D - results in 2.5cm RMS after 80m
 +
 +
 +
* Discussion about CPS article
 +
::* Comments from Donal coming
 +
::* David H. will implement comments from Sean, Donal, and check figure captions
 +
::* Additional authors - Sean will check with Justin on authorship
 +
::::* Add some text on Hall D
 +
::* Try to submit by 11/22
 +
 +
 +
* Discussion about funding proposal
 +
::* budget elementary: magnet and diagnostics
 +
::* require estimate for simulation step 4a, e.g., some phi values to see how much shielding to use and for radiation analysis of magnet coils and iteration with vendor
 +
::* assume JLab provides: support structure, cooling, safety for high radiation, beam line and beam line diagnostics
 +
::* David H. preparing UK funding proposal - include 1-2 pages on CPS; due date is end of November
 +
 +
 +
* CPS collaboration meeting - plan for 3 February or 4 February 2020
 +
::* need to check agenda for NPS collaboration meeting (3 Feb 2020)
 +
::* no obvious conflicts for either day
 +
 +
 +
NEXT CPS PHONE MEETINGS:
 +
* FRIDAY 15 NOVEMBER AT 11:00AM (ET)
 +
* FRIDAY 22 NOVEMBER AT 11:00AM (ET)

Latest revision as of 16:06, 1 November 2019

DISCUSSION MATERIAL


ACTION ITEMS:

  • (David H., Sean, Rolf, Donal, Tanja, ...) Finalize CPS article - target for submission: 22 November
  • implement comments from Sean and Donal
  • check figure captions
  • add more detail on Hall D - Sean will send some text
  • author list
  • (Gabriel) Simulations in preparation for NSF MRI
  • need radiation analysis on coil to determine what isolation material to use - for specific simulation specs see item 4a from 10/11 meeting (need one z-value)
  • need some phi angles to see how much shielding to use - also item 4a
  • (David H., Tanja) Funding proposal
  • prepare an itemized budget for discussion
  • prepare 1-2 page on CPS for David H funding proposal submission
  • CPS collaboration meeting - determine date based on NPS agenda


DETAILS OF THE DISCUSSION

  • CPS simulation update - step 0 is complete!
  • Comparison of Parker Reid to Gabriel Niculescu simulations - they are consistent
  • details of the simulations:
  • both based on cylindrical geometry
  • horizontal axis is the beam direction
  • vertical axis is transverse to beam direction AND integrated over all phi angles
  • should still figure out what the events in the indicated box are - strange since no material there


  • Discussion about next steps for simulation
  • Insert intermediate steps before step 1 to determine material needed for CPS and cost estimate for funding proposal
  • complete step 4a for one z-value, factor 3 sufficient - choice of material
  • need phi angles bins - amount of shielding, radiation going into floor etc.
  • step 1 involves comparison to an Hall C experiment, e.g. J/Psi, to verify activation after 1000 hours running etc.


  • Discussion about beam size in Hall D
  • 10% radiator - take half the size (5%) and assume 11-12 GeV in Hall D - results in 2.5cm RMS after 80m


  • Discussion about CPS article
  • Comments from Donal coming
  • David H. will implement comments from Sean, Donal, and check figure captions
  • Additional authors - Sean will check with Justin on authorship
  • Add some text on Hall D
  • Try to submit by 11/22


  • Discussion about funding proposal
  • budget elementary: magnet and diagnostics
  • require estimate for simulation step 4a, e.g., some phi values to see how much shielding to use and for radiation analysis of magnet coils and iteration with vendor
  • assume JLab provides: support structure, cooling, safety for high radiation, beam line and beam line diagnostics
  • David H. preparing UK funding proposal - include 1-2 pages on CPS; due date is end of November


  • CPS collaboration meeting - plan for 3 February or 4 February 2020
  • need to check agenda for NPS collaboration meeting (3 Feb 2020)
  • no obvious conflicts for either day


NEXT CPS PHONE MEETINGS:

  • FRIDAY 15 NOVEMBER AT 11:00AM (ET)
  • FRIDAY 22 NOVEMBER AT 11:00AM (ET)