Difference between revisions of "General Meeting Summary 7/9/20"

From Cuawiki
Jump to navigation Jump to search
(Created page with "PARTICIPANTS: Aaron Brown, Arshak Asaturyan, Bogdan Wojtsekhowski, Charles Hyde, Hamlet Mkrtchyan, Vardan Tadevosyan, Tanja Horn, Petr Stepanov, Patrizia Rossi, Alexandre Cams...")
 
 
(One intermediate revision by the same user not shown)
Line 28: Line 28:
 
* Preshaping of wrapping - action: send material to JLab
 
* Preshaping of wrapping - action: send material to JLab
  
'''
+
 
MECHANICAL''' (Paulo)
+
'''MECHANICAL''' (Paulo)
  
 
* Req rails for detector out
 
* Req rails for detector out
Line 48: Line 48:
  
  
'''TO DO LIST 2020 REVIEW'''
+
'''NPS TO DO LIST 2020 REVIEW'''
  
 
* Largely on track with schedule adjusted for Covid-19
 
* Largely on track with schedule adjusted for Covid-19
Line 67: Line 67:
  
  
NEXT MEETING: THURSDAY 30 JULY AT 9:00AM (ET)
+
'''NEXT MEETING: THURSDAY 30 JULY AT 9:00AM (ET)'''

Latest revision as of 10:56, 10 July 2020

PARTICIPANTS: Aaron Brown, Arshak Asaturyan, Bogdan Wojtsekhowski, Charles Hyde, Hamlet Mkrtchyan, Vardan Tadevosyan, Tanja Horn, Petr Stepanov, Patrizia Rossi, Alexandre Camsonne, Vladimir Berdnikov, Carlos Munoz-Camacho, Rolf Ent, Julie Roche, David Hamilton, Paulo Medeiros, Marie Boer,


SUMMARY FROM THE DSG (Aaron Brown)

  • Cables
  • 390 made, can make 200 cables/month
  • plan to test all HV cables
  • CAEN crates for EPICS
  • 32/34 almost done
  • WEDM screens being developed as option for remote monitoring


SUBSYSTEM UPDATES

MAGNET

  • Work ongoing


FRAME (Carlos)

  • Progress with the assembly - PMT blocks, mu metal assembly,
  • Preshaping of wrapping - action: send material to JLab


MECHANICAL (Paulo)

  • Req rails for detector out
  • Platform already out
  • Items left to do:
  • magnet support and plate that goes under it
  • patchpanel model - where it goes - how it looks like
  • beamline - square section in front and a few small sections afterwards
  • corrector magnet


RADIATION DETECTOR AND SETUP (Alexandre)

  • Preparing tests with helium ionization chamber to measure neutron and photon separately
  • Could the setup provide possible anode current measurement in Hall A/C?


NPS TO DO LIST 2020 REVIEW

  • Largely on track with schedule adjusted for Covid-19
  • Roughly half of list for frame is done
  • Crytals on schedule
  • HV dividers - plan for path forward exists, waiting on lab resuming normal operations
  • Analysis software development ongoing, e.g. see Jacob Murphy's presentation
  • Much progress by DSG
  • Action: Ask FE/DAQ for presentation at a future meeting


CPS POWER ABSORBER (Bogdan)

  • Deformation risk for Cu core due to high temperature (~400-500 degC)
  • Narrow beam channel and 40cm long piece with diameter of only few mm
  • Deformation of inside slot (where beam is) could be an issue - need beam alignment up to 1mm
  • Should look at the details and see how to include room for motion - system is very compact with W shielding


NEXT MEETING: THURSDAY 30 JULY AT 9:00AM (ET)