Difference between revisions of "General Meeting Agenda 3/6/14"

From Cuawiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
 
* NPS ELECTRONICS TESTS (Alexandre)
 
* NPS ELECTRONICS TESTS (Alexandre)
 
   
 
   
**just started looking for trigger distribution board for FADC but I haven't head from Chris Cuevas yet.
+
::*just started looking for trigger distribution board for FADC but I haven't head from Chris Cuevas yet.
 
Might consider making a mall order of those boards since I have several collaborators who are interested
 
Might consider making a mall order of those boards since I have several collaborators who are interested
in testing the FADC. Will follow up with Chris.
+
in testing the FADC. Will follow up with Chris. Alexander Somov told me he might have a CTP he could loan us
 +
but need to follow up too. Most have been busy with Hall D collaboration meeting.

Latest revision as of 08:54, 6 March 2014

ITEMS FOR DISCUSSION:

  • NPS DESIGN
  • NPS PROTOTYPE TESTS
  • NPS ELECTRONICS TESTS (Alexandre)
  • just started looking for trigger distribution board for FADC but I haven't head from Chris Cuevas yet.

Might consider making a mall order of those boards since I have several collaborators who are interested in testing the FADC. Will follow up with Chris. Alexander Somov told me he might have a CTP he could loan us but need to follow up too. Most have been busy with Hall D collaboration meeting.