(Created page with "DISCUSSION ITEMS * Design models, stress/thermal calculations * Engineering analysis and planning * TCS updates * Other") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
DISCUSSION ITEMS | DISCUSSION ITEMS | ||
− | * Design models, stress/thermal calculations | + | * Design models, stress/thermal calculations |
+ | ::* Design/Engineering [https://wiki.jlab.org/cuawiki/images/c/c4/Status-July-8-2022.pptx Overview Slides] | ||
+ | ::* CPS Magnet [https://wiki.jlab.org/cuawiki/images/e/e9/CPS_MAGNET_.pdf Slides] | ||
* Engineering analysis and planning | * Engineering analysis and planning | ||
Line 8: | Line 10: | ||
* Other | * Other | ||
+ | |||
+ | |||
+ | PARTICIPANTS: Bert Metzger, Rolf Ent, Amy Comer, Bogdan Wojtsekhowski, Hamlet Mkrtchyan, Hovanes Egiyan, Igor Strakovsky, Josh Crafts, Steven Lassiter, Vitaly Baturin, Dean Spiers, Tanja Horn | ||
+ | |||
+ | |||
+ | '''DESIGN/ENGINEERING OVERVIEW''' (Steven L.) | ||
+ | |||
+ | * 486 W blocks on site | ||
+ | |||
+ | * Coil procurement | ||
+ | ::* specification created - in discussion with TOKIN about specification and tolerances | ||
+ | ::* in discussion with TOKIN about specifications and tolerances - concerns about stated tolerances applied to geometric dimensions on flatness and parallelism; conductor cleaning | ||
+ | ::* CPS Tosca model updated to include bolt holes and cutouts | ||
+ | |||
+ | * Prototype (Dean) | ||
+ | ::* on site, machined and assembled | ||
+ | |||
+ | * Working on reqs for yoke and pole | ||
+ | ::* Yoke: 1010; pole: supermendur | ||
+ | ::* working towards deadline - beginning August for end of year clearance | ||
+ | |||
+ | * Insulation material and radiation hardness | ||
+ | ::* glass resin made for Japanese magnet | ||
+ | ::* max expected is MRad, but material should be resistant up to GRad levels | ||
+ | |||
+ | * Started discussions with Hall D about design models | ||
+ | |||
+ | |||
+ | '''MAGNET DESIGN/ASSEMBLY''' (Bert) | ||
+ | |||
+ | * Drawings almost done for yoke and pole | ||
+ | ::* identifying vendors | ||
+ | |||
+ | * Assembly steps outlined | ||
+ | ::* transport stand | ||
+ | ::* fasten coil to side yoke and shim; install | ||
+ | ::* fasten lower yole to stand | ||
+ | ::* check gap on coil | ||
+ | ::* add shims - mm of clearance to be accounted for | ||
+ | ::* fasten lower absorber - using alignment pins | ||
+ | ::* fasten side yoke assembly | ||
+ | ::* side yokes installed; fasten upper shielding | ||
+ | ::* check gap on coil and upper shield blocks, add shims | ||
+ | ::* add upper absorber and springs - still need to figure out pressure | ||
+ | ::* add flags to leads | ||
+ | ::* ready to be shipped to hall and can crane in place | ||
+ | |||
+ | * Testing cooling paths on 3 different models (see below) | ||
+ | |||
+ | * Clearances | ||
+ | |||
+ | * W blocks and cutting for special shapes | ||
+ | |||
+ | * Drawings for yoke assembly expected to be done in about a week | ||
+ | |||
+ | * Survey adjusters to align magnet; fine tuning with beam | ||
+ | |||
+ | * Length of leads will depend on amount of shielding - Gabriel is working on that | ||
+ | |||
+ | * Action item: | ||
+ | ::* check with Gabriel on status of the simulations | ||
+ | |||
+ | |||
+ | '''FLUENT CALCULATIONS - WATER COOLING CHANNEL ANALYSIS''' (Amy) | ||
+ | |||
+ | * Goal: compare Fluent compuration to by-hand for verification | ||
+ | |||
+ | * investigating 3 major designs with multiple cases | ||
+ | |||
+ | * results are very encouraging - ongoing work to interpret the details | ||
+ | |||
+ | |||
+ | |||
+ | '''NEXT MEETING: FRIDAY AUGUST 19 AT 8AM ET''' |
Latest revision as of 11:40, 12 July 2022
DISCUSSION ITEMS
- Design models, stress/thermal calculations
- Design/Engineering Overview Slides
- CPS Magnet Slides
- Engineering analysis and planning
- TCS updates
- Other
PARTICIPANTS: Bert Metzger, Rolf Ent, Amy Comer, Bogdan Wojtsekhowski, Hamlet Mkrtchyan, Hovanes Egiyan, Igor Strakovsky, Josh Crafts, Steven Lassiter, Vitaly Baturin, Dean Spiers, Tanja Horn
DESIGN/ENGINEERING OVERVIEW (Steven L.)
- 486 W blocks on site
- Coil procurement
- specification created - in discussion with TOKIN about specification and tolerances
- in discussion with TOKIN about specifications and tolerances - concerns about stated tolerances applied to geometric dimensions on flatness and parallelism; conductor cleaning
- CPS Tosca model updated to include bolt holes and cutouts
- Prototype (Dean)
- on site, machined and assembled
- Working on reqs for yoke and pole
- Yoke: 1010; pole: supermendur
- working towards deadline - beginning August for end of year clearance
- Insulation material and radiation hardness
- glass resin made for Japanese magnet
- max expected is MRad, but material should be resistant up to GRad levels
- Started discussions with Hall D about design models
MAGNET DESIGN/ASSEMBLY (Bert)
- Drawings almost done for yoke and pole
- identifying vendors
- Assembly steps outlined
- transport stand
- fasten coil to side yoke and shim; install
- fasten lower yole to stand
- check gap on coil
- add shims - mm of clearance to be accounted for
- fasten lower absorber - using alignment pins
- fasten side yoke assembly
- side yokes installed; fasten upper shielding
- check gap on coil and upper shield blocks, add shims
- add upper absorber and springs - still need to figure out pressure
- add flags to leads
- ready to be shipped to hall and can crane in place
- Testing cooling paths on 3 different models (see below)
- Clearances
- W blocks and cutting for special shapes
- Drawings for yoke assembly expected to be done in about a week
- Survey adjusters to align magnet; fine tuning with beam
- Length of leads will depend on amount of shielding - Gabriel is working on that
- Action item:
- check with Gabriel on status of the simulations
FLUENT CALCULATIONS - WATER COOLING CHANNEL ANALYSIS (Amy)
- Goal: compare Fluent compuration to by-hand for verification
- investigating 3 major designs with multiple cases
- results are very encouraging - ongoing work to interpret the details
NEXT MEETING: FRIDAY AUGUST 19 AT 8AM ET