Difference between revisions of "Pictures"
Jump to navigation
Jump to search
(21 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | NPS Assembly | + | NPS de-installation from Hall C - May/June 2024 |
+ | <gallery> | ||
+ | |||
+ | 20240524_170945%280%29_1722862641602.JPEG|1 | ||
+ | HallAC_collab_July2024_mkj-6.jpg|2 | ||
+ | HallAC_collab_July2024_mkj-1.jpg|3 | ||
+ | HallAC_collab_July2024_mkj-2.jpg|4 | ||
+ | HallAC_collab_July2024_mkj-3.jpg|5 | ||
+ | HallAC_collab_July2024_mkj-4.jpg|6 | ||
+ | HallAC_collab_July2024_mkj-5.jpg|7 | ||
+ | NPS-in-EEL-June2024.jpeg|8 NPS in ESB June 2024 | ||
+ | 20240529_165646_1722862644450.JPEG|9 | ||
+ | 20240605_110127_1717599714355.JPEG|10 | ||
+ | 20240628_085259_1722862671862.JPEG|11 | ||
+ | 20240628_092549_1722862672552.JPEG|12 | ||
+ | 20240628_083742_1722862673825.JPEG|13 | ||
+ | 20240610_134410_1722862680216.JPEG|14 | ||
+ | |||
+ | |||
+ | </gallery> | ||
+ | |||
+ | NPS PMT Bases repairs January 2024 | ||
+ | <gallery> | ||
+ | |||
+ | NPS-PMT-bases-repairs-1.png|1 | ||
+ | NPS-PMT-bases-repairs-2.png|2 | ||
+ | |||
+ | </gallery> | ||
+ | |||
+ | |||
+ | NPS installation in Hall C - April 2023 | ||
+ | <gallery> | ||
+ | |||
+ | NPS-04062023-roofblock-cutting-1.jpg|1 Roof block cutting | ||
+ | NPS-04062023-platform-installation-1.jpg|2 Platform installation | ||
+ | NPS-04062023-platform-installation-1.jpg|3 Platform installation | ||
+ | NPS IMG 4284.jpg|4 | ||
+ | NPS IMG 4282.jpg|5 | ||
+ | NPS IMG 4281.jpg|6 | ||
+ | IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 104841 1682003809853.JPEG|8 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 110819 1682004194220.JPEG|9 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 112123 1682004121617.JPEG|10 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 111956 1682004141662.JPEG|11 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 1675.JPG|12 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23) | ||
+ | IMG 1677.JPG|13 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23) | ||
+ | IMG 1679.JPG|14 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23) | ||
+ | |||
+ | |||
+ | </gallery> | ||
+ | |||
+ | |||
+ | |||
+ | NPS pre-installation tests in EEL108 - February/March 2023 | ||
+ | <gallery> | ||
+ | |||
+ | IMG 6620.jpg|1 | ||
+ | IMG 6621.jpg|2 | ||
+ | IMG 6622.jpg|3 | ||
+ | IMG 6624.jpg|4 | ||
+ | IMG 6625.jpg|5 | ||
+ | IMG 6626.jpg|6 | ||
+ | IMG 6628.jpg|7 | ||
+ | IMG 6630.jpg|8 | ||
+ | George_and_Aaron_installing_foil_on_the_front_and_back_of_the_NPS_enclosure_to_improve_noise.jpg|9 DSG working on NPS enclosure to improve noise | ||
+ | Aaron_with_hv_distribution_PCB_NPS.jpg|10 Modification of HV distribution boards | ||
+ | |||
+ | </gallery> | ||
+ | |||
+ | |||
+ | NPS Assembly - January 2023 | ||
<gallery> | <gallery> | ||
Line 10: | Line 80: | ||
NPS-assembly-with-PCBs-side-closeup-2.png|7 | NPS-assembly-with-PCBs-side-closeup-2.png|7 | ||
Nps0.jpeg|8 | Nps0.jpeg|8 | ||
+ | NPS-assembly-Orsay-team-2.png|9 IJCLab-Orsay team | ||
+ | NPS-assembly-Orsay-team-3.png|10 IJCLab-Orsay team | ||
+ | |||
+ | |||
+ | |||
+ | </gallery> | ||
+ | |||
+ | |||
+ | NPS Support on SHMS - trial installation in 2022 | ||
+ | |||
+ | <gallery> | ||
+ | |||
+ | PXL 20220411 120808862.jpg|1 | ||
+ | PXL 20220411 120822182.jpg|2 | ||
+ | PXL 20220411 120827670.jpg|3 | ||
+ | PXL 20220411 121007212.jpg|4 | ||
+ | PXL 20220411 121011251.jpg|5 | ||
+ | PXL 20220411 121022788.jpg|6 | ||
+ | IMG 0177.jpg|7 | ||
+ | IMG 0176.jpg|8 | ||
+ | IMG 0172.jpg|9 | ||
+ | IMG 0173.jpg|10 | ||
+ | IMG 0171.jpg|11 | ||
+ | IMG 0162.jpg|12 | ||
+ | IMG 0112.jpg|13 | ||
+ | IMG 0111.jpg|14 | ||
+ | IMG 0097.jpg|15 | ||
+ | |||
+ | </gallery> | ||
+ | |||
+ | |||
+ | Crystal Module Preparation | ||
+ | |||
+ | <gallery> | ||
+ | |||
+ | Screenshot_2024-08-05_100322.png|1 Preparing the crystal modules | ||
+ | |||
</gallery> | </gallery> | ||
− | + | Crystal Reflector Preparation | |
+ | |||
<gallery> | <gallery> | ||
− | IMG | + | IMG 2647.jpg|1 |
− | IMG | + | IMG 2646.jpg|2 |
− | + | ||
− | + | ||
− | + | </gallery> | |
− | + | ||
− | + | Conceptual drawing of the NPS detector - CUA undergrad student (2017) | |
− | + | <gallery> | |
+ | Calorimeter2.bmp | ||
</gallery> | </gallery> |
Latest revision as of 10:24, 5 August 2024
NPS de-installation from Hall C - May/June 2024
NPS PMT Bases repairs January 2024
NPS installation in Hall C - April 2023
NPS pre-installation tests in EEL108 - February/March 2023
NPS Assembly - January 2023
NPS Support on SHMS - trial installation in 2022
Crystal Module Preparation
Crystal Reflector Preparation
Conceptual drawing of the NPS detector - CUA undergrad student (2017)