Difference between revisions of "Pictures"

From Cuawiki
Jump to navigation Jump to search
 
(21 intermediate revisions by the same user not shown)
Line 1: Line 1:
NPS Assembly
+
NPS de-installation from Hall C - May/June 2024
 +
<gallery>
 +
 
 +
20240524_170945%280%29_1722862641602.JPEG|1
 +
HallAC_collab_July2024_mkj-6.jpg|2
 +
HallAC_collab_July2024_mkj-1.jpg|3
 +
HallAC_collab_July2024_mkj-2.jpg|4
 +
HallAC_collab_July2024_mkj-3.jpg|5
 +
HallAC_collab_July2024_mkj-4.jpg|6
 +
HallAC_collab_July2024_mkj-5.jpg|7
 +
NPS-in-EEL-June2024.jpeg|8 NPS in ESB June 2024
 +
20240529_165646_1722862644450.JPEG|9
 +
20240605_110127_1717599714355.JPEG|10
 +
20240628_085259_1722862671862.JPEG|11
 +
20240628_092549_1722862672552.JPEG|12
 +
20240628_083742_1722862673825.JPEG|13
 +
20240610_134410_1722862680216.JPEG|14
 +
 
 +
 
 +
</gallery>
 +
 
 +
NPS PMT Bases repairs January 2024
 +
<gallery>
 +
 
 +
NPS-PMT-bases-repairs-1.png|1
 +
NPS-PMT-bases-repairs-2.png|2
 +
 
 +
</gallery>
 +
 
 +
 
 +
NPS installation in Hall C - April 2023
 +
<gallery>
 +
 
 +
NPS-04062023-roofblock-cutting-1.jpg|1 Roof block cutting
 +
NPS-04062023-platform-installation-1.jpg|2 Platform installation
 +
NPS-04062023-platform-installation-1.jpg|3 Platform installation
 +
NPS IMG 4284.jpg|4
 +
NPS IMG 4282.jpg|5
 +
NPS IMG 4281.jpg|6
 +
IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 104841 1682003809853.JPEG|8 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 110819 1682004194220.JPEG|9 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 112123 1682004121617.JPEG|10 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 20230420 111956 1682004141662.JPEG|11 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 1675.JPG|12 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1677.JPG|13 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1679.JPG|14 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
 
 +
 
 +
</gallery>
 +
 
 +
 
 +
 
 +
NPS pre-installation tests in EEL108 - February/March 2023
 +
<gallery>
 +
 
 +
IMG 6620.jpg|1
 +
IMG 6621.jpg|2
 +
IMG 6622.jpg|3
 +
IMG 6624.jpg|4
 +
IMG 6625.jpg|5
 +
IMG 6626.jpg|6
 +
IMG 6628.jpg|7
 +
IMG 6630.jpg|8
 +
George_and_Aaron_installing_foil_on_the_front_and_back_of_the_NPS_enclosure_to_improve_noise.jpg|9 DSG working on NPS enclosure to improve noise
 +
Aaron_with_hv_distribution_PCB_NPS.jpg|10 Modification of HV distribution boards
 +
 
 +
</gallery>
 +
 
 +
 
 +
NPS Assembly - January 2023
 
<gallery>
 
<gallery>
  
Line 10: Line 80:
 
NPS-assembly-with-PCBs-side-closeup-2.png|7
 
NPS-assembly-with-PCBs-side-closeup-2.png|7
 
Nps0.jpeg|8
 
Nps0.jpeg|8
 +
NPS-assembly-Orsay-team-2.png|9 IJCLab-Orsay team
 +
NPS-assembly-Orsay-team-3.png|10 IJCLab-Orsay team
 +
 +
 +
 +
</gallery>
 +
 +
 +
NPS Support on SHMS - trial installation in 2022
 +
 +
<gallery>
 +
 +
PXL 20220411 120808862.jpg|1
 +
PXL 20220411 120822182.jpg|2
 +
PXL 20220411 120827670.jpg|3
 +
PXL 20220411 121007212.jpg|4
 +
PXL 20220411 121011251.jpg|5
 +
PXL 20220411 121022788.jpg|6
 +
IMG 0177.jpg|7
 +
IMG 0176.jpg|8
 +
IMG 0172.jpg|9
 +
IMG 0173.jpg|10
 +
IMG 0171.jpg|11
 +
IMG 0162.jpg|12
 +
IMG 0112.jpg|13
 +
IMG 0111.jpg|14
 +
IMG 0097.jpg|15
 +
 +
</gallery>
 +
 +
 +
Crystal Module Preparation
 +
 +
<gallery>
 +
 +
Screenshot_2024-08-05_100322.png|1 Preparing the crystal modules
 +
  
 
</gallery>
 
</gallery>
  
NPS pre-installation tests in EEL108
+
Crystal Reflector Preparation
 +
 
 
<gallery>
 
<gallery>
  
IMG 6620.jpg|1
+
IMG 2647.jpg|1
IMG 6621.jpg|2
+
IMG 2646.jpg|2
IMG 6622.jpg|3
+
 
IMG 6624.jpg|4
+
 
IMG 6625.jpg|5
+
</gallery>
IMG 6626.jpg|6
+
 
IMG 6628.jpg|7
+
Conceptual drawing of the NPS detector - CUA undergrad student (2017)
IMG 6630.jpg|8
+
<gallery>
  
 +
Calorimeter2.bmp
  
 
</gallery>
 
</gallery>

Latest revision as of 10:24, 5 August 2024

NPS de-installation from Hall C - May/June 2024

NPS PMT Bases repairs January 2024


NPS installation in Hall C - April 2023


NPS pre-installation tests in EEL108 - February/March 2023


NPS Assembly - January 2023


NPS Support on SHMS - trial installation in 2022


Crystal Module Preparation

Crystal Reflector Preparation

Conceptual drawing of the NPS detector - CUA undergrad student (2017)