Difference between revisions of "Pictures"
Jump to navigation
Jump to search
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | NPS de-installation from Hall C - May/June 2024 | ||
+ | <gallery> | ||
+ | |||
+ | 20240524_170945%280%29_1722862641602.JPEG|1 | ||
+ | HallAC_collab_July2024_mkj-6.jpg|2 | ||
+ | HallAC_collab_July2024_mkj-1.jpg|3 | ||
+ | HallAC_collab_July2024_mkj-2.jpg|4 | ||
+ | HallAC_collab_July2024_mkj-3.jpg|5 | ||
+ | HallAC_collab_July2024_mkj-4.jpg|6 | ||
+ | HallAC_collab_July2024_mkj-5.jpg|7 | ||
+ | NPS-in-EEL-June2024.jpeg|8 NPS in ESB June 2024 | ||
+ | 20240529_165646_1722862644450.JPEG|9 | ||
+ | 20240605_110127_1717599714355.JPEG|10 | ||
+ | 20240628_085259_1722862671862.JPEG|11 | ||
+ | 20240628_092549_1722862672552.JPEG|12 | ||
+ | 20240628_083742_1722862673825.JPEG|13 | ||
+ | 20240610_134410_1722862680216.JPEG|14 | ||
+ | |||
+ | |||
+ | </gallery> | ||
+ | |||
+ | NPS PMT Bases repairs January 2024 | ||
+ | <gallery> | ||
+ | |||
+ | NPS-PMT-bases-repairs-1.png|1 | ||
+ | NPS-PMT-bases-repairs-2.png|2 | ||
+ | |||
+ | </gallery> | ||
+ | |||
+ | |||
NPS installation in Hall C - April 2023 | NPS installation in Hall C - April 2023 | ||
<gallery> | <gallery> | ||
Line 8: | Line 38: | ||
NPS IMG 4282.jpg|5 | NPS IMG 4282.jpg|5 | ||
NPS IMG 4281.jpg|6 | NPS IMG 4281.jpg|6 | ||
+ | IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 104841 1682003809853.JPEG|8 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 110819 1682004194220.JPEG|9 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 112123 1682004121617.JPEG|10 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 20230420 111956 1682004141662.JPEG|11 Uncabling the detector in EEL for transport to hall (4/20/23) | ||
+ | IMG 1675.JPG|12 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23) | ||
+ | IMG 1677.JPG|13 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23) | ||
+ | IMG 1679.JPG|14 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23) | ||
+ | |||
</gallery> | </gallery> | ||
− | NPS pre-installation tests in EEL108 - February 2023 | + | |
+ | |||
+ | NPS pre-installation tests in EEL108 - February/March 2023 | ||
<gallery> | <gallery> | ||
Line 22: | Line 63: | ||
IMG 6628.jpg|7 | IMG 6628.jpg|7 | ||
IMG 6630.jpg|8 | IMG 6630.jpg|8 | ||
− | + | George_and_Aaron_installing_foil_on_the_front_and_back_of_the_NPS_enclosure_to_improve_noise.jpg|9 DSG working on NPS enclosure to improve noise | |
+ | Aaron_with_hv_distribution_PCB_NPS.jpg|10 Modification of HV distribution boards | ||
</gallery> | </gallery> | ||
Line 38: | Line 80: | ||
NPS-assembly-with-PCBs-side-closeup-2.png|7 | NPS-assembly-with-PCBs-side-closeup-2.png|7 | ||
Nps0.jpeg|8 | Nps0.jpeg|8 | ||
+ | NPS-assembly-Orsay-team-2.png|9 IJCLab-Orsay team | ||
+ | NPS-assembly-Orsay-team-3.png|10 IJCLab-Orsay team | ||
+ | |||
+ | |||
</gallery> | </gallery> | ||
Line 64: | Line 110: | ||
</gallery> | </gallery> | ||
+ | |||
+ | Crystal Module Preparation | ||
+ | |||
+ | <gallery> | ||
+ | |||
+ | Screenshot_2024-08-05_100322.png|1 Preparing the crystal modules | ||
+ | |||
+ | |||
+ | </gallery> | ||
Crystal Reflector Preparation | Crystal Reflector Preparation |
Latest revision as of 10:24, 5 August 2024
NPS de-installation from Hall C - May/June 2024
NPS PMT Bases repairs January 2024
NPS installation in Hall C - April 2023
NPS pre-installation tests in EEL108 - February/March 2023
NPS Assembly - January 2023
NPS Support on SHMS - trial installation in 2022
Crystal Module Preparation
Crystal Reflector Preparation
Conceptual drawing of the NPS detector - CUA undergrad student (2017)