(Created page with "Meeting report for ePIC-EIC Roma2, March 27, 2024 <font color="red"><b>Coordination Meeting</b></font> <br> <ol> Attending: R. Ammendola, B. Benkel, M. Bondì, A. D'Angelo...") |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
Attending: | Attending: | ||
− | R. Ammendola, B. Benkel | + | R. Ammendola, B. Benkel, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti. |
<li> <font color="green"><b>General Points</b></font>:<br> | <li> <font color="green"><b>General Points</b></font>:<br> | ||
− | A. D'Angelo: the review to assess the readiness for the TDR was completed last week and the answer is available. The deadline to produce the TDR is July, the checks will be done in December. It has to be ready for April 2025. | + | A. D'Angelo: the review to assess the readiness for the TDR was completed last week and the answer is available. The deadline to produce the TDR is July (to be written with the possibility to add changes at request), the checks will be done in December. It has to be ready for April 2025. |
− | R. Ammendola: yesterday a meeting with M. Contalbrigo and Roma 1 group was held. This was a general meeting about the simulations status. | + | As for the acquisition system we now have two functioning FECs. |
− | L. Lanza: Confluence page is ready, team members can | + | R. Ammendola: yesterday a meeting for DRICH with M. Contalbrigo and Roma 1 group was held. This was a general meeting about the simulations status. |
− | https://confluence.infn.it/display/ePICmpgd/ePIC_MPGD | + | L. Lanza: Confluence page is ready, team members can proceed with registration: |
− | https://confluence.infn.it/display/ePICmpgd/Electron-Ion+Collider+Detectors%3A+MPGD+ECT | + | |
+ | * https://confluence.infn.it/display/ePICmpgd/ePIC_MPGD | ||
+ | |||
+ | And the specific page is: | ||
+ | |||
+ | * https://confluence.infn.it/display/ePICmpgd/Electron-Ion+Collider+Detectors%3A+MPGD+ECT | ||
Line 21: | Line 26: | ||
[https://wiki.jlab.org/cuawiki/index.php/Electron-Ion_Collider_Detectors:_MPGD_ECT Back to the wikipage] | [https://wiki.jlab.org/cuawiki/index.php/Electron-Ion_Collider_Detectors:_MPGD_ECT Back to the wikipage] | ||
<br> | <br> | ||
− | [https://wiki.jlab.org/cuawiki/index.php/EIC- | + | [https://wiki.jlab.org/cuawiki/index.php/EIC-3-April-24-minutes Go to next meeting] |
<br> | <br> | ||
− | [https://clasweb.jlab.org/wiki/index.php/EIC- | + | [https://clasweb.jlab.org/wiki/index.php/EIC-20-March-24-minutes Go to previous meeting] |
Latest revision as of 05:21, 27 March 2024
Meeting report for ePIC-EIC Roma2, March 27, 2024
Coordination Meeting
-
Attending:
R. Ammendola, B. Benkel, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti.
- General Points:
A. D'Angelo: the review to assess the readiness for the TDR was completed last week and the answer is available. The deadline to produce the TDR is July (to be written with the possibility to add changes at request), the checks will be done in December. It has to be ready for April 2025. As for the acquisition system we now have two functioning FECs. R. Ammendola: yesterday a meeting for DRICH with M. Contalbrigo and Roma 1 group was held. This was a general meeting about the simulations status. L. Lanza: Confluence page is ready, team members can proceed with registration: And the specific page is: