Difference between revisions of "EIC-25-September-24-minutes"

From Cuawiki
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
Attending:  
 
Attending:  
  
A. D'Angelo, R. Di Salvo, L. Lanza, G. Nobili, E. Sidoretti.
+
R. Ammendola, M. Bondì, A. D'Angelo, R. Di Salvo, L. Lanza, G. Nobili, E. Sidoretti.
  
 
<li> <font color="green"><b>General Points</b></font>:<br>
 
<li> <font color="green"><b>General Points</b></font>:<br>
Line 12: Line 12:
  
 
* Sequence for the test beam: Tracker - DUT -DUT -DUT -DUT - Tracker
 
* Sequence for the test beam: Tracker - DUT -DUT -DUT -DUT - Tracker
* Tracker: GEM + muRWELL (no CS and no TOP)
+
* Tracker: GEM + muRWELL (no CS and no TOP no groove - compass type)
 
* DUT: coupled - each couple is in enemy-> first couple is GEM - muRWELL, the other one is (no GEM) - muRWELL (groove type).  
 
* DUT: coupled - each couple is in enemy-> first couple is GEM - muRWELL, the other one is (no GEM) - muRWELL (groove type).  
 
* 24 apv are needed, 12 SRC channels divided into two FEC schedules.
 
* 24 apv are needed, 12 SRC channels divided into two FEC schedules.
  
 +
Groove chambers have to be charged as top ones.
 
</ol>
 
</ol>
 
<hr>
 
<hr>

Latest revision as of 05:35, 25 September 2024

Meeting report for ePIC-EIC Roma2, September 25, 2024

Coordination Meeting

    Attending: R. Ammendola, M. Bondì, A. D'Angelo, R. Di Salvo, L. Lanza, G. Nobili, E. Sidoretti.
  1. General Points:
    The possible test beam dates maybe will be different. The chambers are not arrived yet. The tool box is necessary for the test beam. The mechanical workshop has finished to produce instrumentation for the test beam. Gianfranco Morello has already bought the gas. The two 2D chambers are a new generation "groove" ones: the second dimension is read on the top, but with an improved resolution.
    • Sequence for the test beam: Tracker - DUT -DUT -DUT -DUT - Tracker
    • Tracker: GEM + muRWELL (no CS and no TOP no groove - compass type)
    • DUT: coupled - each couple is in enemy-> first couple is GEM - muRWELL, the other one is (no GEM) - muRWELL (groove type).
    • 24 apv are needed, 12 SRC channels divided into two FEC schedules.
    Groove chambers have to be charged as top ones.


Back to the wikipage
Go to next meeting
Go to previous meeting