Difference between revisions of "General Meeting Summary 4/5/18"
Jump to navigation
Jump to search
(Created page with "PROTOTYPE AND SIMULATION (Vladimir, Alex Somov) * Discussion of prototype cosmic data analysis result vs. simulation of the prototype setup - globally looks good ::* Action I...") |
|||
Line 25: | Line 25: | ||
* Action Item: measure another 20 PMTs | * Action Item: measure another 20 PMTs | ||
+ | |||
CRYSTALS (Vladimir, Rong Wang, Ho San, Tanja, Carlos) | CRYSTALS (Vladimir, Rong Wang, Ho San, Tanja, Carlos) |
Latest revision as of 17:33, 7 April 2018
PROTOTYPE AND SIMULATION (Vladimir, Alex Somov)
- Discussion of prototype cosmic data analysis result vs. simulation of the prototype setup - globally looks good
- Action Items:
- Remove LY source comparison as setup is different and cannot directly compare with prototype
- Add assumptions that went into simulation
- Add conditions for prototype measurement
- Discussion of prototype calibration studies
- Demonstrates calibration procedure
- Energy resolution on order 2.1% (ideal would be 1.3-1.4%) - currently limited by setup to improve resolution
- Action Items:
- Test different high voltages - at low voltages particularly susceptible to magnetic fields
- Check if possible to remove additional material (TRD, GEM etc.) to reduce scattering
- COMCAL as prototype - design is flexible to accommodate a carbon structure to hold crystals
PMT DIAMETER MEASUREMENT (Vladimir, Hamlet)
- Measurement of 20 PMTs were performed by Hamlet
- Result is 18.86 +- 0.066 mm (systematic error is 25um)
- This tolerance is 10x smaller than that quoted by the manufacturer (18.6 +- 0.7 mm)
- Action Item: measure another 20 PMTs
CRYSTALS (Vladimir, Rong Wang, Ho San, Tanja, Carlos)
- Visual inspection of 40 crystals from SICCAS shipment 3 shows the most of these are not passing requirement due to old labels traces, yellow coloring, significant cracks and bubbles in bulk and on surface
- Ongoing work at IPNO on cross calibrating the crystal testing setups - now have a much better understanding, results will be shown at a future meeting
- Discussions with CRYTUR ongoing - there has been a delay with obtaining the required crucibles for making crystals to NPS specifications, but the company expects to start first tests in the second part of April
NPS FRAME (Carlos)
- Ongoing work: handling cables in back
- Discussion about frame simulation spectra with different gap widths.
- Previous studies have shown that up to 1mm gaps are reasonable and tail contribution not a concern
- For larger gaps contribution of tail can be significant
- Might be good to quote FWHM instead of RMS
MAGNET (Bogdan)
- Assembly and testing to start in April
TCS BACKGROUND STUDIES (Vardan)
- Discussion of simulation results
- Current used is standard CPS current of 2.5uA electron beam
- Based on rates simulation may need to exclude central region of tracker - this cutout propagates to more backward detectors
- Marie's studies suggest that removing this region does not affect the physics
- Discussion about electron/positron energy spectrum and why no electrons above 2 GeV - seems to be due to finite angular acceptance, but might require further study
TCS Uncertainties (Marie)
- Discussion of current results - need to iterate with Vardan's recent studies
NEXT MEETING: THURSDAY 26 APRIL AT 9:00AM (EDT)