(Created page with "The main topics discussed at this meeting were: # Follow-up on the items from the last meeting (background studies and kinematics - see list below) # Report from Simon Sirca on ...")
 
Line 3: Line 3:
 
# Follow-up on the items from the last meeting (background studies and kinematics - see list below)
 
# Follow-up on the items from the last meeting (background studies and kinematics - see list below)
 
# Report from Simon Sirca on WACS simulations
 
# Report from Simon Sirca on WACS simulations
 +
 +
  
 
[http://www.vsl.cua.edu/cua_phy/images/6/60/Wacs_writeup1.pdf  Simon's report on WACS simulations]
 
[http://www.vsl.cua.edu/cua_phy/images/6/60/Wacs_writeup1.pdf  Simon's report on WACS simulations]

Revision as of 12:27, 14 March 2013

The main topics discussed at this meeting were:

  1. Follow-up on the items from the last meeting (background studies and kinematics - see list below)
  2. Report from Simon Sirca on WACS simulations


Simon's report on WACS simulations


Items from last time

  • What is the desired optimal distance from target for the detector front face for forward angles. This info is prerequisite for background studies, e.g., beam pipe.
  • Figure: background per block as function of angle for 1uA beam current and 10cm target (similar to figure of dose rate as function of angle)
  • Background estimates at smallest angle and at 11 GeV (and bigger beam pipe)
  • Summary of details on geometry information needed for WACS (e.g. resolution), DVCS (e.g., scattering chamber dimensions, beam pipe dimensions, etc.), and perhaps others(?)
  • How much of DVCS projected beam time can be shared with pi0 DES and SIDIS (including both Hall A and C kinematics)