(Created page with "NPS COLLABORATION MEETING - 1 FEBRUARY * Discussion draft agenda ::* reduce talk time ::* leave breaks - need ~1hour for lunch * Discussion presentation template for ERR rel...")
 
 
Line 17: Line 17:
 
::::* Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible
 
::::* Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible
  
* Action items:
+
* '''Action items''':
 
::* Have preliminary drafts of documentation
 
::* Have preliminary drafts of documentation
 
::* Prepare task list for 1 Feb collaboration meeting
 
::* Prepare task list for 1 Feb collaboration meeting
  
 
* ERR dates - send suggestions for dates in frame March-April to Patrizia
 
* ERR dates - send suggestions for dates in frame March-April to Patrizia
 +
 +
 +
MAGNET UPDATE (Bogdan)
 +
 +
* Magnet ready, water lines have been connected
 +
 +
* Power supply - plan s to energize within next week
 +
 +
 +
FRAME UPDATE (Carlos)
 +
 +
* Good progress on assembly of modules (2 x 2)
 +
::* improved assembly/disassembly mechanics and procedure, e.g. captive screw that will stay attached to the frame and not fall when trying to disassemble
 +
::* still looking into some details of attaching fiber, e.g. glue to either crystal or frame
 +
 +
* Design of PCB boards is complete and ready for production
 +
::* LEDs on board, short fiber to crystal, control LED by flat cables
 +
::* signal connectors are one end SMA (similar size to LEMO, but more complicated to plug in/out) and LEMO on other end
 +
::* HV connectors are Ficher (smaller than regular SHV)
 +
 +
* Access to PMTs improved
 +
::* boards slide like curtain to left/right - can almost access PMTs by hand from the back, but might need to optimize distance
 +
 +
* Cooling
 +
::* chilled plates around calorimeter crystals
 +
::* cooled air in space between crystal and PCB - this space is crowded with many cables, poor air flow - difficult to cool
 +
 +
* Temperature gradient crystals
 +
::* will have probes in the box to measure temperature
 +
::* discussing fan performance with vendor
 +
::* isolation from room - boundary condition air
 +
 +
* Time frame - start construction in second half of the year and finish early next year.
 +
 +
* Funds availability - will confirm on 1 Feb
 +
 +
 +
CRYSTALS (Vladimir)
 +
 +
* Completed visual inspection of ~90% of first batch of CRYTUR crystals
 +
::* NO rejections
 +
 +
* Planning to measure tolerances for frame in next weeks
 +
:: Crystal lengths are same for SICCAS and CRYTUR, but area slightly different
 +
 +
* '''Action Item:''' make matrix where Crytur and SICCAS crystals would go - send numbers to Hamlet
 +
 +
* Prototype: commissioning complete, will present preliminary results at collaboration meeting
  
  
 
NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY
 
NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY

Latest revision as of 11:59, 20 January 2019

NPS COLLABORATION MEETING - 1 FEBRUARY

  • Discussion draft agenda
  • reduce talk time
  • leave breaks - need ~1hour for lunch
  • Discussion presentation template for ERR related talks


EXPERIMENT READINESS REVIEW (ERR)

  • Discussion of draft charge
  • Items that need more detailed discussion are points 4, 5, 7, 8, and 9
  • Point 4: define pieces and responsibilities
  • Point 7: need generated radiation levels, submit preliminary radiation assessment documentation?
  • Point 8: Readiness for calorimeter analysis
  • Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible
  • Action items:
  • Have preliminary drafts of documentation
  • Prepare task list for 1 Feb collaboration meeting
  • ERR dates - send suggestions for dates in frame March-April to Patrizia


MAGNET UPDATE (Bogdan)

  • Magnet ready, water lines have been connected
  • Power supply - plan s to energize within next week


FRAME UPDATE (Carlos)

  • Good progress on assembly of modules (2 x 2)
  • improved assembly/disassembly mechanics and procedure, e.g. captive screw that will stay attached to the frame and not fall when trying to disassemble
  • still looking into some details of attaching fiber, e.g. glue to either crystal or frame
  • Design of PCB boards is complete and ready for production
  • LEDs on board, short fiber to crystal, control LED by flat cables
  • signal connectors are one end SMA (similar size to LEMO, but more complicated to plug in/out) and LEMO on other end
  • HV connectors are Ficher (smaller than regular SHV)
  • Access to PMTs improved
  • boards slide like curtain to left/right - can almost access PMTs by hand from the back, but might need to optimize distance
  • Cooling
  • chilled plates around calorimeter crystals
  • cooled air in space between crystal and PCB - this space is crowded with many cables, poor air flow - difficult to cool
  • Temperature gradient crystals
  • will have probes in the box to measure temperature
  • discussing fan performance with vendor
  • isolation from room - boundary condition air
  • Time frame - start construction in second half of the year and finish early next year.
  • Funds availability - will confirm on 1 Feb


CRYSTALS (Vladimir)

  • Completed visual inspection of ~90% of first batch of CRYTUR crystals
  • NO rejections
  • Planning to measure tolerances for frame in next weeks
Crystal lengths are same for SICCAS and CRYTUR, but area slightly different
  • Action Item: make matrix where Crytur and SICCAS crystals would go - send numbers to Hamlet
  • Prototype: commissioning complete, will present preliminary results at collaboration meeting


NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY