Difference between revisions of "Summary 2/3/20"

From Cuawiki
Jump to navigation Jump to search
(Created page with "Notes by Charles Hyde •Summarize full to-do list in hall, and estimated time to completion •Estimate time for configuration changes during beam running •Document interfe...")
 
Line 1: Line 1:
 
Notes by Charles Hyde
 
Notes by Charles Hyde
•Summarize full to-do list in hall, and estimated time to completion
+
:•Summarize full to-do list in hall, and estimated time to completion
•Estimate time for configuration changes during beam running
+
:•Estimate time for configuration changes during beam running
•Document interferences between NPS, BeamLine, HMS
+
:•Document interferences between NPS, BeamLine, HMS
••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022)
+
:••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022)
• How is the Calorimeter, Cabling, etc assembled
+
:• How is the Calorimeter, Cabling, etc assembled

Revision as of 09:33, 3 February 2020

Notes by Charles Hyde

•Summarize full to-do list in hall, and estimated time to completion
•Estimate time for configuration changes during beam running
•Document interferences between NPS, BeamLine, HMS
••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022)
• How is the Calorimeter, Cabling, etc assembled