Line 8: Line 8:
 
::•DVCS, pi0 maybe OK at 30% power
 
::•DVCS, pi0 maybe OK at 30% power
 
::•Future RCS will require full power (with NPS on outer side of SHMS)
 
::•Future RCS will require full power (with NPS on outer side of SHMS)
 +
:• Do we mix-and-match Crytur and SICCAS crystals?
 +
::•Order ~200 more crystals from Crytur and wait ~1year for full delivery?

Revision as of 11:22, 3 February 2020

Notes by Charles Hyde

•Summarize full to-do list in hall, and estimated time to completion
•Estimate time for configuration changes during beam running
•Document interferences between NPS, BeamLine, HMS
•Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022)
• How is the Calorimeter, Cabling, etc assembled
•Do we run Sweep Magnet at full power or ~30%?
•DVCS, pi0 maybe OK at 30% power
•Future RCS will require full power (with NPS on outer side of SHMS)
• Do we mix-and-match Crytur and SICCAS crystals?
•Order ~200 more crystals from Crytur and wait ~1year for full delivery?