(Created page with "PARTICIPANTS: Charles Hyde, Bogdan Wojtsekhowski, Arshak Asaturyan, Vardan Tadevosyan, A Comer, Hamlet Mkrtchyan, Alexandre Camsonne, Paulo Medeiros, Steven Lassiter, Vladimir...")
 
Line 2: Line 2:
  
  
MAGNET
+
'''MAGNET'''
  
 
Work ongoing
 
Work ongoing
  
FRAME (Carlos)
+
'''FRAME''' (Carlos)
  
 
* Photos from pre-lock down illustrate the assembly status - some of the smaller components were assembled off-site during lock down and are ready to be included when possible
 
* Photos from pre-lock down illustrate the assembly status - some of the smaller components were assembled off-site during lock down and are ready to be included when possible
 
* Small number of people allowed part time on site now and some assembly can continue, subject to new distancing rules etc.
 
* Small number of people allowed part time on site now and some assembly can continue, subject to new distancing rules etc.
  
NPS LOGO  
+
'''NPS LOGO'''
  
 
* Presentation of the logo planned to be included on the NPS frame
 
* Presentation of the logo planned to be included on the NPS frame
 
* Optimizations and other suggestions welcome
 
* Optimizations and other suggestions welcome
  
CABLING
+
'''CABLING'''
 
* NPS cable making is ongoing at JLab (off-site)
 
* NPS cable making is ongoing at JLab (off-site)
 
::* SMA for signal
 
::* SMA for signal
Line 23: Line 23:
 
* How to test cables?
 
* How to test cables?
  
MECHANICAL DESIGN (Paulo, Steven L.)
+
'''MECHANICAL DESIGN''' (Paulo, Steven L.)
  
 
* Released requisitions for structural components (platform)
 
* Released requisitions for structural components (platform)
Line 31: Line 31:
 
* Prepared and passed on step files for corrector magnet  
 
* Prepared and passed on step files for corrector magnet  
  
* Results from field integral calculations (Bogdan)
+
* '''Results from field integral calculations''' (Bogdan)
 
::* Significant integral BdL (~30-40kGauss) without corrector, need to compensate for field integral  
 
::* Significant integral BdL (~30-40kGauss) without corrector, need to compensate for field integral  
 
::* Field integral not large - can build corrector without much problem (cost ~$10k)
 
::* Field integral not large - can build corrector without much problem (cost ~$10k)
Line 47: Line 47:
  
  
HV DIVIDER - ANODE CURRENT
+
'''HV DIVIDER - ANODE CURRENT'''
  
 
* Review of the issue and discussion of possible solutions
 
* Review of the issue and discussion of possible solutions
Line 57: Line 57:
  
  
NEXT MEETING: THURSDAY 11 JUNE AT 9AM (ET)
+
'''NEXT MEETING: THURSDAY 11 JUNE AT 9AM (ET)'''

Revision as of 08:48, 29 May 2020

PARTICIPANTS: Charles Hyde, Bogdan Wojtsekhowski, Arshak Asaturyan, Vardan Tadevosyan, A Comer, Hamlet Mkrtchyan, Alexandre Camsonne, Paulo Medeiros, Steven Lassiter, Vladimir Berdnikov, Carlos Munoz-Camacho, Jacob Murphy, Marie Boer, Hakob Voskanyan, Rolf Ent, David Hamilton, Julie Roche, Tanja Horn


MAGNET

Work ongoing

FRAME (Carlos)

  • Photos from pre-lock down illustrate the assembly status - some of the smaller components were assembled off-site during lock down and are ready to be included when possible
  • Small number of people allowed part time on site now and some assembly can continue, subject to new distancing rules etc.

NPS LOGO

  • Presentation of the logo planned to be included on the NPS frame
  • Optimizations and other suggestions welcome

CABLING

  • NPS cable making is ongoing at JLab (off-site)
  • SMA for signal
  • Fischer for HV
  • Samtec HV
  • How to test cables?

MECHANICAL DESIGN (Paulo, Steven L.)

  • Released requisitions for structural components (platform)
  • Expect all other parts to be submitted by end of week
  • Prepared and passed on step files for corrector magnet
  • Results from field integral calculations (Bogdan)
  • Significant integral BdL (~30-40kGauss) without corrector, need to compensate for field integral
  • Field integral not large - can build corrector without much problem (cost ~$10k)
  • Corrector cannot compensate for shift in position, still have significant displacement - shift is on level of 4cm creating a background: low energy particles will scrape beam line
  • To address this issue would like to shift corrector 15cm downstream - requires to modify a pipe (~$3k)
  • Discussion:
  • Corrector in beam line after magnet has been difficult traditionally - cables, power supplies space issues, radiation of components
  • Flux exclusion tube vs. corrector magnet? - Is there enough space? Tube seems more complex and complicated than corrector
  • Installation of corrector: clamped on beam line, no separate support
  • Current density: 200-300 A/cm2, no water cooling - the latter is important since located in a high radiation area
  • Corrector is a protection of beam dump - magnet controlled by MCC, deflection without magnet of primary beam is 6cm at beam dump
  • Can corrector magnet hang off the NPS magnet and rotate with the magnet?
  • General consensus to proceed with the corrector magnet design


HV DIVIDER - ANODE CURRENT

  • Review of the issue and discussion of possible solutions
  • Need to reduce PMT gain - 10^6 too much and even 10^5 too much, 10^4 might be fine, but then need to figure out how to do amplification
  • Bogdan's slides summarize several options to reduce anode current, but need feedback from Fernando's group on base modifications
  • Action Item: Meet with Fernando on base modifications