(Created page with "PARTICIPATNS: Aaron Brown, Alexander Somov, Arshak Asaturyan, Brad Sawatzky, Carlos Munoz-Camacho, Carlos Yero, Bogdan Wojsekhowski, Rolf Ent, Hakob Voskanyan, Hamlet Mkrtchya...") |
|||
Line 57: | Line 57: | ||
* '''Action items''': | * '''Action items''': | ||
− | ::* impact of one layer SICCAS on NPS resolution? - Carlos will check with Ho-San on | + | ::* impact of one layer SICCAS on NPS resolution? - Carlos will check with Ho-San on available MC samples (idea: smear energy of existing output file and re-run clustering and missing mass reconstruction) |
::* stacking strategy decision (depends on first item) | ::* stacking strategy decision (depends on first item) | ||
::::* review options in the NPS tasklist | ::::* review options in the NPS tasklist |
Latest revision as of 10:15, 30 April 2021
PARTICIPATNS: Aaron Brown, Alexander Somov, Arshak Asaturyan, Brad Sawatzky, Carlos Munoz-Camacho, Carlos Yero, Bogdan Wojsekhowski, Rolf Ent, Hakob Voskanyan, Hamlet Mkrtchyan, Julie Roche, Paulo Medeiros, Stephen Wood, Steven Lassiter, Vardan Tadevosyan, Vladimir Berdnikov
ANODE CURRENT MEASUREMENTS (Vladimir)
- Ongoing work: design a new divider with the changes observed so far and with a new, externally powered amplifier
- Design new divider
- Prototyping
- Finalize production by June
- Connection divider to socket and testing
- Impact of magnetic field on low HV PMT - no difference to before since main impact is distance to first dynode and that does not change.
- Brief update on linearity measurements
- Action Items
- Prepare a summary of studies and optimized divider design based on them at the next meeting including
DSG UPDATES (Aaron)
- HV Supply switching tests - all cables and connectors perform well so far
- Hardware Interlock system program and interfaces in development
MECHANICAL DESIGN/ENGINEERING (Paulo)
- Detector cart out for procurement
- Joints for platform installation given to work coordinator
- Will start welding to SHMS soon
- cable routing plan - ongoing activity
SUPPORT HARDWARE (Brad)
- Fast Electronics Group
- Samtec connector certification - procedure developed - results will go into OSP
- testing a few more components
CRYSTALS (Vladimir, Alex S.)
- Crytur
- crystals arrive in small batches each month - visual inspection looks good
- more crystals grown with new raw material arrived - no obvious difference to previous crystals
- old raw material: purchased from BTCP premixed by Giessen U. and has been used for NPS crystals so far
- new raw material: purchased by Crytur from a Russian vendor (Neochem)
- planning to test new vs. old raw material crystals with prototype in beam
- Hall D experiences delays with Siccas
- problems with Pb oxide powder
- so far received 300 out of ~900 crystals that were due at beginning of the year
- Action items:
- impact of one layer SICCAS on NPS resolution? - Carlos will check with Ho-San on available MC samples (idea: smear energy of existing output file and re-run clustering and missing mass reconstruction)
- stacking strategy decision (depends on first item)
- review options in the NPS tasklist