Difference between revisions of "Pictures"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | NPS installation in Hall C - April 2023 | ||
+ | <gallery> | ||
+ | |||
+ | NPS-04062023-roofblock-cutting-1.jpg|1 | ||
+ | NPS-04062023-platform-installation-1.jpg|2 | ||
+ | NPS-04062023-platform-installation-1.jpg|3 | ||
+ | |||
+ | |||
+ | |||
+ | </gallery> | ||
+ | |||
NPS pre-installation tests in EEL108 - February 2023 | NPS pre-installation tests in EEL108 - February 2023 | ||
<gallery> | <gallery> |
Revision as of 15:27, 18 April 2023
NPS installation in Hall C - April 2023
NPS pre-installation tests in EEL108 - February 2023
NPS Assembly - January 2023
NPS Support on SHMS - trial installation in 2022
Crystal Reflector Preparation
Conceptual drawing of the NPS detector - CUA undergrad student (2017)