Difference between revisions of "Pictures"

From Cuawiki
Jump to navigation Jump to search
Line 8: Line 8:
 
NPS IMG 4282.jpg|5
 
NPS IMG 4282.jpg|5
 
NPS IMG 4281.jpg|6
 
NPS IMG 4281.jpg|6
 +
IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall
 +
IMG 20230420 104841 1682003809853.JPEG|8
 +
IMG 20230420 112123 1682004121617.JPEG|9
 +
IMG 20230420 111956 1682004141662.JPEG|10
 +
IMG 20230420 110819 1682004194220.JPEG|11
  
 
</gallery>
 
</gallery>
 +
 +
  
 
NPS pre-installation tests in EEL108 - February/March 2023
 
NPS pre-installation tests in EEL108 - February/March 2023

Revision as of 17:32, 21 April 2023

NPS installation in Hall C - April 2023


NPS pre-installation tests in EEL108 - February/March 2023


NPS Assembly - January 2023


NPS Support on SHMS - trial installation in 2022


Crystal Reflector Preparation

Conceptual drawing of the NPS detector - CUA undergrad student (2017)