Difference between revisions of "Pictures"
Jump to navigation
Jump to search
Line 49: | Line 49: | ||
NPS-assembly-with-PCBs-side-closeup-2.png|7 | NPS-assembly-with-PCBs-side-closeup-2.png|7 | ||
Nps0.jpeg|8 | Nps0.jpeg|8 | ||
+ | https://wiki.jlab.org/cuawiki/images/5/54/NPS-assembly-Orsay-team-2.png|9 | ||
+ | https://wiki.jlab.org/cuawiki/images/6/6b/NPS-assembly-Orsay-team-3.png|10 | ||
+ | |||
+ | |||
</gallery> | </gallery> |
Revision as of 08:55, 5 August 2024
NPS installation in Hall C - April 2023
NPS pre-installation tests in EEL108 - February/March 2023
NPS Assembly - January 2023
- Https://wiki.jlab.org/cuawiki/images/5/54/NPS-assembly-Orsay-team-2.png
9
- Https://wiki.jlab.org/cuawiki/images/6/6b/NPS-assembly-Orsay-team-3.png
10
NPS Support on SHMS - trial installation in 2022
Crystal Reflector Preparation
Conceptual drawing of the NPS detector - CUA undergrad student (2017)