Difference between revisions of "EEEMCal Beam Tests"

From Cuawiki
Jump to navigation Jump to search
(Replaced content with "Back to [https://wiki.jlab.org/cuawiki/index.php/Electron-Ion_Collider_Detectors:_EEEMCal EEEMCAL Main Page] ='''SciGlass prototype 2022''' = Detailed descriptions...")
Tag: Replaced
Line 1: Line 1:
 
Back to [https://wiki.jlab.org/cuawiki/index.php/Electron-Ion_Collider_Detectors:_EEEMCal EEEMCAL Main Page]
 
Back to [https://wiki.jlab.org/cuawiki/index.php/Electron-Ion_Collider_Detectors:_EEEMCal EEEMCAL Main Page]
  
 +
The EEEMCal group is has been carrying out detector prototype beam tests at Jefferson Lab and DESY. The next beam tests are planned for 2024.
  
 
='''[[SciGlass prototype 2022]]''' =
 
='''[[SciGlass prototype 2022]]''' =
Line 9: Line 10:
  
 
= [[EEEMCAL BEAM TESTS 2021]] =
 
= [[EEEMCAL BEAM TESTS 2021]] =
 
 
The EEEMCal group is planning prototype beam tests at Jefferson Lab and DESY. The next beam test slot at DESY is May 2-15, 2022.
 
  
 
== Beam tests at Jefferson Lab (contact: [mailto:hornt@cua.edu Tanja Horn]) ==
 
== Beam tests at Jefferson Lab (contact: [mailto:hornt@cua.edu Tanja Horn]) ==
The next possible '''prototype test beam in Hall D at JLab will start on 4 August 2022 and run through 16 October 2022'''. Another testing period may be available between 22 October - 20 December. The exact periods for EEEMCal prototype tests will be announced soon.
 
 
  
 
== Beam tests at DESY (contact: [mailto:hasell@mit.edu Douglas Hasell]) ==
 
== Beam tests at DESY (contact: [mailto:hasell@mit.edu Douglas Hasell]) ==
 
The '''next test beam run at DESY will be May 2-15, 2022 in test beam area TB 24'''.  However, I am planning to go to DESY the previous week arriving around April 23 to get a head-start on unpacking, setting-up, and making any repairs and upgrades using TB 24.1 as a staging area without beam.  Then on Monday, May 2, we should be able to simply roll everything from TB 24.1 into TB 24 and be ready for beam with a minimum of lost time.
 

Revision as of 11:03, 19 December 2023

Back to EEEMCAL Main Page

The EEEMCal group is has been carrying out detector prototype beam tests at Jefferson Lab and DESY. The next beam tests are planned for 2024.

SciGlass prototype 2022

Detailed descriptions of the SciGlass prototype beam tests in 2022 and 2023. (contact: Yeran Ghandilyan for site content)

EEEMCAL BEAM TESTS 2022 and 2023

EEEMCAL BEAM TESTS 2021

Beam tests at Jefferson Lab (contact: Tanja Horn)

Beam tests at DESY (contact: Douglas Hasell)