Difference between revisions of "EIC-3-April-24-minutes"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
* E. Sidoretti: code debugging for READOUT system is improving. | * E. Sidoretti: code debugging for READOUT system is improving. | ||
− | * A. D'Angelo: M. Posik sent a message specifying that the inner radius for the hadron endcap disk is required to be 9 cm. M. Posik has renewed his interest in the production of the disks. M. Contalbrigo from JLab asked if there is an interest to produce muRwell detectors for an experiment at JLab with transverse polarization. | + | * A. D'Angelo: M. Posik sent a message specifying that the inner radius for the hadron endcap disk is required to be 9 cm. M. Posik has renewed his interest in the production of the disks. M. Contalbrigo from JLab asked if there is an interest to produce muRwell detectors for an experiment at JLab with transverse polarization. Link to subscribe to the mailing list for bi-weekly Thursday meetings about R&D: |
+ | |||
+ | https://mailman.jlab.org/mailman/listinfo/mpgd-eicgen-rd | ||
Revision as of 10:16, 4 April 2024
Meeting report for ePIC-EIC Roma2, April 27, 2024
Coordination Meeting
-
Attending:
R. Ammendola, A. D'Angelo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi.
- General Points:
- E. Sidoretti: code debugging for READOUT system is improving.
- A. D'Angelo: M. Posik sent a message specifying that the inner radius for the hadron endcap disk is required to be 9 cm. M. Posik has renewed his interest in the production of the disks. M. Contalbrigo from JLab asked if there is an interest to produce muRwell detectors for an experiment at JLab with transverse polarization. Link to subscribe to the mailing list for bi-weekly Thursday meetings about R&D:
Back to the wikipage
Go to next meeting
Go to previous meeting