Difference between revisions of "EIC-17-April-24-minutes"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
* A. D'Angelo: news for the orders and for the coordination. | * A. D'Angelo: news for the orders and for the coordination. | ||
** Some researches have been done to assess it was possible to host the January 2025 EIC Collaboration meeting in Villa Mondragone. 2 days of plenary sessions (Sala degli Svizzeri) + 3 days of parallel sections (small halls). | ** Some researches have been done to assess it was possible to host the January 2025 EIC Collaboration meeting in Villa Mondragone. 2 days of plenary sessions (Sala degli Svizzeri) + 3 days of parallel sections (small halls). | ||
− | ** Tomorrow a meeting will be held | + | ** Tomorrow a meeting will be held about pre-preg width: Capton, DLS (resistive), pre-preg, PCB (with readout strips). |
</ol> | </ol> | ||
<hr> | <hr> |
Revision as of 04:36, 17 April 2024
Meeting report for ePIC-EIC Roma2, April 17, 2024
Coordination Meeting
-
Attending:
R. Ammendola, B. Benkel, M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi.
- General Points:
- E. Sidoretti: the DAQ is now working: it has to be customized now.
- A. D'Angelo: news for the orders and for the coordination.
- Some researches have been done to assess it was possible to host the January 2025 EIC Collaboration meeting in Villa Mondragone. 2 days of plenary sessions (Sala degli Svizzeri) + 3 days of parallel sections (small halls).
- Tomorrow a meeting will be held about pre-preg width: Capton, DLS (resistive), pre-preg, PCB (with readout strips).
Back to the wikipage
Go to next meeting
Go to previous meeting