Difference between revisions of "Pictures"
Jump to navigation
Jump to search
Line 33: | Line 33: | ||
IMG 6628.jpg|7 | IMG 6628.jpg|7 | ||
IMG 6630.jpg|8 | IMG 6630.jpg|8 | ||
− | + | George_and_Aaron_installing_foil_on_the_front_and_back_of_the_NPS_enclosure_to_improve_noise.jpg|9 DSG working on NPS enclosure to improve noise | |
+ | Aaron_with_hv_distribution_PCB_NPS.jpg|10 Modification of HV distribution boards | ||
</gallery> | </gallery> | ||
Line 49: | Line 50: | ||
NPS-assembly-with-PCBs-side-closeup-2.png|7 | NPS-assembly-with-PCBs-side-closeup-2.png|7 | ||
Nps0.jpeg|8 | Nps0.jpeg|8 | ||
− | NPS-assembly-Orsay-team-2.png|9 | + | NPS-assembly-Orsay-team-2.png|9 IJCLab-Orsay team |
− | NPS-assembly-Orsay-team-3.png|10 | + | NPS-assembly-Orsay-team-3.png|10 IJCLab-Orsay team |
Revision as of 09:00, 5 August 2024
NPS installation in Hall C - April 2023
NPS pre-installation tests in EEL108 - February/March 2023
NPS Assembly - January 2023
NPS Support on SHMS - trial installation in 2022
Crystal Reflector Preparation
Conceptual drawing of the NPS detector - CUA undergrad student (2017)