(Created page with "PAC45 RECAP * Committee saw one technical (CPS) and two science presentations (polarized WACS and KLong)- results were distributed by email * Report will be available and p...") |
|||
Line 27: | Line 27: | ||
* Discussion about curing system design - IPNO will test different LEDs to which one most suitable for curing and do not damage the PMTs | * Discussion about curing system design - IPNO will test different LEDs to which one most suitable for curing and do not damage the PMTs | ||
+ | ::* Note that DVCS found that PMTs are affected (gain changes) by blue light curing even with HV offf | ||
+ | |||
+ | * Discussion about flexibility of installation of curing system since PMTs are not removable | ||
+ | |||
+ | * Middle August will optimize frame design (interference and symmetric part) with designer | ||
Next steps: | Next steps: | ||
::* Send a few PMTs to IPNO for curing system testing | ::* Send a few PMTs to IPNO for curing system testing | ||
− | + | ||
+ | NPS HV BASES AND PMTS | ||
+ | |||
+ | * 35 PMTs are on order from OU, 50 PMTs have arrived at JLab | ||
+ | |||
+ | |||
+ | CRYSTALS | ||
+ | |||
+ | * Discussion about ongoing chemical analysis at CUA | ||
+ | |||
+ | * 100 crystals expected to arrive at JLab end of month | ||
+ | |||
+ | * Discussion about assembly once all components available - make a plan for that | ||
+ | |||
+ | * Next steps: | ||
+ | ::* writing documentation of crystals tests and also including responsibilities and work flow | ||
+ | |||
+ | |||
+ | |||
+ | NEXT MEETING: 24 AUGUST at 9:00 AM (EDT) |
Latest revision as of 07:06, 28 July 2017
PAC45 RECAP
- Committee saw one technical (CPS) and two science presentations (polarized WACS and KLong)- results were distributed by email
- Report will be available and posted shortly
- Next steps: continue working group meetings on CPS to optimize design, e.g. shielding
MAGNET ASSEMBLY AND TESTING
- Discussion about W. Akers drawing of magnet and detector frame in test lab and availability of cooling water and electrical services
- one good option for power supply for NPS magnet is that from HKS
- some re-arrangement of the designated area may be needed to make the required field mapping measurements - most efficient may be to attach the mapper to the magnet, at most will map 3x distance away from magnet gap
- Update on magnet components:
- Corrector coil is at JLab
- Main coil expected end of August
- Yoke expected end of August
- Next steps:
- Provide W. Akers with a drawing/picture of the power supply to be used
- Design of mapper - Charles will provide the required specifics of the mapper along the beam line
NPS FRAME
- Discussion about curing system design - IPNO will test different LEDs to which one most suitable for curing and do not damage the PMTs
- Note that DVCS found that PMTs are affected (gain changes) by blue light curing even with HV offf
- Discussion about flexibility of installation of curing system since PMTs are not removable
- Middle August will optimize frame design (interference and symmetric part) with designer
Next steps:
- Send a few PMTs to IPNO for curing system testing
NPS HV BASES AND PMTS
- 35 PMTs are on order from OU, 50 PMTs have arrived at JLab
CRYSTALS
- Discussion about ongoing chemical analysis at CUA
- 100 crystals expected to arrive at JLab end of month
- Discussion about assembly once all components available - make a plan for that
- Next steps:
- writing documentation of crystals tests and also including responsibilities and work flow
NEXT MEETING: 24 AUGUST at 9:00 AM (EDT)