Difference between revisions of "General Meeting Agenda 12/12/12"
Jump to navigation
Jump to search
(Created page with "This meeting was the first follow-up meeting after the Workshop on DVCS and other Physics Opportunities with a Neutral Particle Spectrometer in Hall C. Topics of discussion inclu...") |
|||
Line 5: | Line 5: | ||
* Organization of the next formal workshop | * Organization of the next formal workshop | ||
− | The slides discussed at the meeting are shown at | + | |
+ | The slides discussed at the meeting are shown at this link: | ||
[http://www.vsl.cua.edu/cua_phy/images/b/bb/NPS_physics_meeting_12dec2012.pdf Slides discussed during the Meeting] | [http://www.vsl.cua.edu/cua_phy/images/b/bb/NPS_physics_meeting_12dec2012.pdf Slides discussed during the Meeting] |
Latest revision as of 12:20, 14 March 2013
This meeting was the first follow-up meeting after the Workshop on DVCS and other Physics Opportunities with a Neutral Particle Spectrometer in Hall C. Topics of discussion included
- Strategy for PAC submission of proposals and equipment funding
- Experimental requirements document draft
- Organization of the next formal workshop
The slides discussed at the meeting are shown at this link: