Difference between revisions of "General Meeting Agenda 3/15/18"
Jump to navigation
Jump to search
(Created page with "Discussion topics: * Updates subsystems * NPS prototype and installation in Hall D (Vladimir) * TCS background simulations (Vardan) * Crystal specs for Hall D COMCAL and F...") |
|||
Line 5: | Line 5: | ||
* NPS prototype and installation in Hall D (Vladimir) | * NPS prototype and installation in Hall D (Vladimir) | ||
− | * TCS background simulations (Vardan) | + | * [https://wiki.jlab.org/cuawiki/images/1/1d/GammaConversionBackground.pdf TCS background simulations] (Vardan) |
* Crystal specs for Hall D COMCAL and FCAL (Liping) | * Crystal specs for Hall D COMCAL and FCAL (Liping) | ||
* Other | * Other |
Revision as of 21:58, 14 March 2018
Discussion topics:
- Updates subsystems
- NPS prototype and installation in Hall D (Vladimir)
- TCS background simulations (Vardan)
- Crystal specs for Hall D COMCAL and FCAL (Liping)
- Other