(Created page with "TIMELIKE COMPTON SCATTERING * Update on projection studies * Discussion about TCS setup ::* Discussion about proton identification (along with electron and positron) - curre...") |
|||
Line 50: | Line 50: | ||
* Crystal tests ongoing (SICCAS, systematic uncertainties between setups) | * Crystal tests ongoing (SICCAS, systematic uncertainties between setups) | ||
+ | |||
+ | * Procurement Crytur ongoing | ||
+ | |||
+ | * MRI project extended | ||
* Prototype (3x3) calibration procedure | * Prototype (3x3) calibration procedure |
Latest revision as of 18:43, 26 April 2018
TIMELIKE COMPTON SCATTERING
- Update on projection studies
- Discussion about TCS setup
- Discussion about proton identification (along with electron and positron) - current idea is to use tracker for time-of-flight in addition to energy deposition
- Can one identify protons also with hodoscope and shower counter alone?
- Discussion about backgrounds and trigger
- Background rates seem difficult to manage, puzzling: e-/e+ at large angles (pair production at high momentum?) - possible option: design trigger to make manageable
- Need to understand where particles of interest go
- Plan for proposal: submit to PAC46
- Action Items: Show what setup will work including showing need for tracker
NPS FRAME
- Work progressing well and faster than before as more resources available now
- Overall Plan: final design at end of year, construction in 2019, ship to JLab in summer 2019
- Near-term plan: build prototype to test mechanical aspects: stability of system, assembly - expect first results end of May 2018
- Also plan to travel to JLab end of summer for discussion of details with designers
- Current focus areas: Cooling system, dealing with cables, connector budget
PMT/HV BASES
- Making good progress. Connectors were on back-order, but should arrive end of week - work can start then
- No physical final design yet, but Julie has photographs of new board/connectors
- New board and connectors feature 5 pins on board and connectors have both signal and HV
MAGNET
- Work started in test lab with mechanical assembly. Photographs show:
- Front clamp
- Part of yoke
- Gap - nonuniform shape of magnet
- Water and power are being setup in test lab for magnet testing
CRYSTALS AND PROTOTYPE
- Crystal tests ongoing (SICCAS, systematic uncertainties between setups)
- Procurement Crytur ongoing
- MRI project extended
- Prototype (3x3) calibration procedure
- Results show energy resolution of 2.2% - this method uses all data from run, no scan of detector segments as previous method
- Next steps to improve resolution: PMT gains and HV optimization, more statistics, timing adjustment, central pair spectrometer tile search improvement
NEXT MEETING: THURSDAY 10 MAY at 9:00 AM (EDT)