HOMEWORK
 +
 +
* Finalize Section VI (Safety and Engineering) - Donal, Dustin, Rolf
 +
::* General idea is to include: 1) Impact of radiation on materials, e.g. target coils, 2) Temperature and cooling, 3) Engineering aspects like weight and installation considerations
 +
::* Add qualifier that not final design
 +
::* Reduce number of bulleted lists
 +
::* Update info on how much material is needed - Jixie simulation, Bogdan/Rolf analytical estimate
 +
::* Include Buckley magnet quote in cost estimate
 +
 +
* Section I (Summary)
 +
::* Make clear which conclusions directly address the PAC45 questions
 +
::* Add sentence about other experiments that add to CPS science - currently driven by WACS, but there are others, e.g. TCS, ...
 +
 +
* Section II (Motivation and Science Gain)
 +
::* Some re-shuffling, section/subsection assignment, and different titles to emphasize implications for polarized target when placing CPS near it and relation to science gain
 +
::* Replace target limitation subsection title with something along lines "implications for...", "pushing performance of..", ...
 +
 +
 +
ASSIGNMENTS AND TIMEFRAME - TARGET DATE 31 MAY 2018
 +
 +
* Start review and editing of sections 1-5 and appendix 1 and 2 (David, Thia)
 +
 +
* Finalize Section VI by ~5/28 (Donal, Rolf, Bogdan, Jixie)
 +
 +
* Send corrections, edits for all sections to hornt@cua.edu (all)
 +
 +
 +
MATERIAL USED IN 5/22/18 MEETING:
 +
 
Discussion of [https://wiki.jlab.org/cuawiki/images/d/d7/CPS_document-rev4.2.1.pdf CPS document draft 5/22/18]
 
Discussion of [https://wiki.jlab.org/cuawiki/images/d/d7/CPS_document-rev4.2.1.pdf CPS document draft 5/22/18]

Revision as of 07:47, 23 May 2018

HOMEWORK

  • Finalize Section VI (Safety and Engineering) - Donal, Dustin, Rolf
  • General idea is to include: 1) Impact of radiation on materials, e.g. target coils, 2) Temperature and cooling, 3) Engineering aspects like weight and installation considerations
  • Add qualifier that not final design
  • Reduce number of bulleted lists
  • Update info on how much material is needed - Jixie simulation, Bogdan/Rolf analytical estimate
  • Include Buckley magnet quote in cost estimate
  • Section I (Summary)
  • Make clear which conclusions directly address the PAC45 questions
  • Add sentence about other experiments that add to CPS science - currently driven by WACS, but there are others, e.g. TCS, ...
  • Section II (Motivation and Science Gain)
  • Some re-shuffling, section/subsection assignment, and different titles to emphasize implications for polarized target when placing CPS near it and relation to science gain
  • Replace target limitation subsection title with something along lines "implications for...", "pushing performance of..", ...


ASSIGNMENTS AND TIMEFRAME - TARGET DATE 31 MAY 2018

  • Start review and editing of sections 1-5 and appendix 1 and 2 (David, Thia)
  • Finalize Section VI by ~5/28 (Donal, Rolf, Bogdan, Jixie)
  • Send corrections, edits for all sections to hornt@cua.edu (all)


MATERIAL USED IN 5/22/18 MEETING:

Discussion of CPS document draft 5/22/18