Difference between revisions of "NPS ERR"
Jump to navigation
Jump to search
Line 42: | Line 42: | ||
* [https://wiki.jlab.org/cuawiki/images/0/02/COO_draft.pdf Conduct of Operations (COO)] | * [https://wiki.jlab.org/cuawiki/images/0/02/COO_draft.pdf Conduct of Operations (COO)] | ||
− | * [https://hallcweb.jlab.org/safety-docs/current/ESAD.pdf Experiment Safety Assessment Document (ESAD)] | + | * Current version: [https://hallcweb.jlab.org/safety-docs/current/ESAD.pdf Experiment Safety Assessment Document (ESAD)]. Pre-draft of NPS version: [https://hallcweb.jlab.org/safety-docs/NPS/ESAD_NPS_predraft.pdf NPS ESAD] |
* [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Standard Equipment Manual] | * [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Standard Equipment Manual] |
Revision as of 21:20, 14 May 2019
NPS Experimental Readiness Review 2019
- Experiments: E12-13-010, E12-13-007, E12-14-003, E12-14-005
Time and Location
- Date: May 15, 2019
- Location: CEBAF Center Room L102
- ERR Charge: NPS ERR Charge
- ERR Committee: Stepan Stepanyan (chair), Renuka Rajput-Ghoshal, Ben Raydo, Robin Wines, Nathan Baltzell, Lorenzo Zana, Keith Welch, Raffaella De Vita, Valery Kubarovsky, Yves Roblin, Ed Folts (observer), Javier Gomez (observer)
Agenda
Wednesday May 15, 2019
- 8:30 (30) Executive Session
- 9:00 (10) Remarks from Chair and Charge - TBD
- 9:10 (20+10) Charge Items 1, 5: Overview, general requirements, equipment to achieve scientific goals, manpower pdf - Tanja Horn
- 9:40 (30+15) Charge Items 4, 5, 7, 9: Apparatus ownership, maintenance and control, safety documentation, radiation levels pdf - Steve Wood
- 10:25 (20) - Coffee Break
- 10:45 (20+10) Charge Items 2c, 3: Mechanical structures, installation pdf - Steve Lassiter
- 11:15 (20+10) Charge Items 2a, 3: NPS magnet pptx pdf - Charles Hyde
- 11:45 (20+10) Charge Items 2b, 3: NPS calorimeter pdf, pptx - Carlos Munoz-Camacho
- 12:15 (20+10) Charge Items 2d-f, 3: Electronics, infrastructure, trigger pdf - Brad Sawatzky
- 12:45 (75) - Working Lunch
- 14:00 (10+5) Charge Item 6: Beam commissioning pdf - Jay Benesch
- 14:15 (20+10) Charge Item 8: Software, reconstruction; Collaboration documented track record pdf- Gabriel Niculescu
- 14:45 Executive Session
- 17:30 Close Out
Documentation Drafts
- Current version: Experiment Safety Assessment Document (ESAD). Pre-draft of NPS version: NPS ESAD
- NPS How-To and references Base Equipment Howtos
Checklists
Miscellaneous
- Installation Plans
- Beamline and equipment responsibility