Difference between revisions of "Pictures"

From Cuawiki
Jump to navigation Jump to search
Line 9: Line 9:
 
NPS IMG 4281.jpg|6
 
NPS IMG 4281.jpg|6
 
IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23)
 
IMG 20230420 111513 1682003765537.JPEG|7 Uncabling the detector in EEL for transport to hall (4/20/23)
IMG 20230420 104841 1682003809853.JPEG|8  
+
IMG 20230420 104841 1682003809853.JPEG|8 Uncabling the detector in EEL for transport to hall (4/20/23)
IMG 20230420 110819 1682004194220.JPEG|9
+
IMG 20230420 110819 1682004194220.JPEG|9 Uncabling the detector in EEL for transport to hall (4/20/23)
 
IMG 20230420 112123 1682004121617.JPEG|10 The team
 
IMG 20230420 112123 1682004121617.JPEG|10 The team
IMG 20230420 111956 1682004141662.JPEG|11
+
IMG 20230420 111956 1682004141662.JPEG|11 Uncabling the detector in EEL for transport to hall (4/20/23)
 +
IMG 1675.JPG|12 NPS detector translated and mounted on the lifting frame, prior to moving into the hall (5/8/23)
 +
IMG 1677.JPG|13
 +
IMG 1679.JPG|14
 +
 
  
 
</gallery>
 
</gallery>

Revision as of 14:46, 8 May 2023

NPS installation in Hall C - April 2023


NPS pre-installation tests in EEL108 - February/March 2023


NPS Assembly - January 2023


NPS Support on SHMS - trial installation in 2022


Crystal Reflector Preparation

Conceptual drawing of the NPS detector - CUA undergrad student (2017)