Difference between revisions of "EIC-10-April-24-minutes"

From Cuawiki
Jump to navigation Jump to search
Line 9: Line 9:
  
 
<li> <font color="green"><b>General Points</b></font>:<br>
 
<li> <font color="green"><b>General Points</b></font>:<br>
* E. Sidoretti: code debugging for READOUT system is improving.  
+
* E. Sidoretti: the DAQ is not working: it does not compile at the moment.  
  
* A. D'Angelo: M. Posik sent a message specifying that the inner radius for the hadron endcap disk is required to be 9 cm. M. Posik has renewed his interest in the production of the disks. M. Contalbrigo from JLab asked if there is an interest to produce muRwell detectors for an experiment at JLab with transverse polarization.
+
* A. D'Angelo: a GEM foil has been ordered to Rui.  
 
 
** Link to subscribe to the mailing list for bi-weekly Thursday meetings about R&D: https://mailman.jlab.org/mailman/listinfo/mpgd-eicgen-rd
 
  
  

Revision as of 04:46, 10 April 2024

Meeting report for ePIC-EIC Roma2, April 10, 2024

Coordination Meeting

    Attending: B. Benkel, A. D'Angelo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti.
  1. General Points:
    • E. Sidoretti: the DAQ is not working: it does not compile at the moment.
    • A. D'Angelo: a GEM foil has been ordered to Rui.


Back to the wikipage
Go to next meeting
Go to previous meeting