(Created page with "PARTICIPANTS: Afnan Shatat, Holly, Carlos, Douglas, Tanja, Ethan, Matthew Nguyen, Renee, Rosi, Larry, Justin, Sasha, Vardan, Joerg, Hrachya, Julie, Hamlet, DESY BEAM TEST P...") |
|||
Line 44: | Line 44: | ||
* Discussion about documentation and upcoming final design review | * Discussion about documentation and upcoming final design review | ||
− | ::* Action: need to identify a good way to generate the needed documentation | + | ::* '''Action''': need to identify a good way to generate the needed documentation |
:::* how are previous documentations folded in? | :::* how are previous documentations folded in? | ||
:::* how are recent/ongoing beam tests folded in? | :::* how are recent/ongoing beam tests folded in? |
Revision as of 10:52, 7 February 2025
PARTICIPANTS: Afnan Shatat, Holly, Carlos, Douglas, Tanja, Ethan, Matthew Nguyen, Renee, Rosi, Larry, Justin, Sasha, Vardan, Joerg, Hrachya, Julie, Hamlet,
DESY BEAM TEST PREPARATION
- Overall Goal of the February test: test different readout chains (e.g., discrete vs. ASIC) with Orsay prototype
- Orsay prototype is ready. Will be shipped to DESY with expected arrival on 12 Feb
- some personnel will arrive on Friday 2/14 to start setting up DAQ; assembly of the prototype will follow on Monday after the safety lecture as some personnel need to pass that training
- Discrete readout chain preparation are on track
- PCBs arrived at JLab and were sent on to Gerard after minor modifications
- Larry has been working on the power cables/distribution box and has sent them on to Gerard
- Gerard is planning to do some tests of both
- Justin will pick up all components from Gerard including a LV power supply and bring everything to DESY
- An overall run plan for the February beam test has been discussed - details are still being sorted
- Next beam test preparation meeting is on 11 February at 10:30AM ET
- Looking ahead there are 2-3 additional beam tests planned:
- 24 March++ at DESY: direct comparison of PMT/SiPM, Crytur prototype with different readout and chain, and any additional readout chain tests based on February investigation
- is any pulse shaping needed for the PMTS? Note that the same digitizer (V1725) has been used in previous beam tests with PMT. May need to review the details
- June at DESY: contingency. Need to start coordinating this beam slot as Douglas and Ethan will likely not be available or not available for the entire time
- June/July at JLAB: initial discussions have started on how to integrate the ASIC based readout with the HD infrastructure, but need to follow up on the details
NSF PROPOSAL
- Discussion about possible proposal planning
- Given that the proposal submission deadline is still posted as 19 March 2025 and the review uncertainty it may be wise to give SPOs a heads up
OTHER
- Discussion with ePIC-DSC on 7 Feb
- discussion in EEEMCAL context about the points circulated by ePIC TC
- Carlos/Tanja will report from the meeting
- Discussion about ongoing reports
- European strategy plan is out for review
- pre TDR time line more relaxed - summer to end of year
- Discussion about documentation and upcoming final design review
- Action: need to identify a good way to generate the needed documentation
- how are previous documentations folded in?
- how are recent/ongoing beam tests folded in?
NEXT MEETING: FRIDAY 21 FEBRUARY AT 8:00 AM ET