PARTICIPANTS: Richard, Joerg, Justin, Josh, Tanja, Larry, Carlos, Julie, Ioana, Sasha, Rosi, Matt Nguyen, Hrachya, Renee, Gerard, Ethan, Holly, 
 +
 +
 +
'''DISCUSSION NSF MSRI PREPROPOSAL
 +
'''
 +
* No news on the pre-proposal
 +
 +
* Full proposal submission deadline is now 5 June 2025 (https://www.nsf.gov/funding/opportunities/mid-scale-ri-1-mid-scale-research-infrastructure-1)
 +
 +
* We will start working on updating the proposal document and supplementary information now and plan to have the documents ready in early May
 +
 +
* '''Actions'''
 +
::* Overleaf link to the proposal has been created by Renee. The link was circulated on Sept 6, 2024.
 +
::* Get updated quotes for all items (All)
 +
::* Justin will make a new google drive for collecting documents for the proposal submission
 +
::* For updating budgets - in general there should not be major changes from the pre-proposal - review the master spreadsheet, but do not edit it
 +
:::* If only small changes to the budget, e.g., salary/wage figures, complete the blank budget spreadsheet and send it to Ioana and Tanja
 +
:::* If there are changes to the efforts, e.g., when a person works on what task etc., contact Ioana and Tanja
 +
::* Project Execution Plan - need to update the budget and possibly other information
 +
::* Narrative - need to make consistent with pre-proposal and cross check with any other comments received last time.
 +
 +
 +
'''DISCUSSION PWO CRYSTALS AND TESTING'''
 +
 +
* The CD3A scope includes 1069 crystals
 +
::* The first articles (110 crystals) have been shipped and are en route to JLab - acceptance tests will be done there
 +
::* After acceptance of the first articles regular monthly shipments of at least 70 crystals/month will commence
 +
 +
* Discussion about crystal storage
 +
::* NPS cleanroom capacity: currently can store an additional ~600 crystals
 +
::* There may be additional storage space at JLab - need to investigate
 +
 +
* Crystal test benches
 +
::* UKY and JMU have been setting up test benches for crystal tests. Both have one PWO crystal that can be used for cross checking.
 +
::* Expect to be ready to exercise crystal test procedures soon
 +
 +
*'''Actions'''
 +
::* Investigate crystal storage space at JLab
 +
::* Send one crystal each to Larry and Justin for SiPM board tests
 +
 +
 +
'''BEAM TESTS AT DESY'''
 +
 +
* March beam test will commence on 3/24. Goals are:
 +
::* Run Crytur system
 +
::* Measure energy resolution with MIT 5x5 prototype with SiPM readout
 +
::* Direct comparison of two channels with SiPM
 +
::* Possibly insert a glass block in the central position
 +
 +
* Analysis of the data from February
 +
::* HCROC data are being analyzed at Orsay including pedestal and width fluctuations and noisy channels. Expect initial results to the expert group in ~3 weeks
 +
::* discrete data are being analyzed at OU. Planning to present status early next week and implement any feedback.
 +
 +
 +
'''FINAL DESIGN REVIEW PLANNING'''
 +
 +
* Presently planned for May 2025
 +
 +
* The main item to be reviewed is the mechanical design - 90% level
 +
 +
* Requires information from the beam test on the readout chains. If decision on the readout chain is made in ~2 weeks then still requires implementation into the mechanical model. May 2025 may still be possible, but it is very tight.
 +
 +
 +
'''NEXT MEETING: FRIDAY 4 APRIL AT 8:00AM ET'''

Latest revision as of 10:07, 21 March 2025

Back to Meetings Main Page

PARTICIPANTS: Richard, Joerg, Justin, Josh, Tanja, Larry, Carlos, Julie, Ioana, Sasha, Rosi, Matt Nguyen, Hrachya, Renee, Gerard, Ethan, Holly,


DISCUSSION NSF MSRI PREPROPOSAL

  • No news on the pre-proposal
  • We will start working on updating the proposal document and supplementary information now and plan to have the documents ready in early May
  • Actions
  • Overleaf link to the proposal has been created by Renee. The link was circulated on Sept 6, 2024.
  • Get updated quotes for all items (All)
  • Justin will make a new google drive for collecting documents for the proposal submission
  • For updating budgets - in general there should not be major changes from the pre-proposal - review the master spreadsheet, but do not edit it
  • If only small changes to the budget, e.g., salary/wage figures, complete the blank budget spreadsheet and send it to Ioana and Tanja
  • If there are changes to the efforts, e.g., when a person works on what task etc., contact Ioana and Tanja
  • Project Execution Plan - need to update the budget and possibly other information
  • Narrative - need to make consistent with pre-proposal and cross check with any other comments received last time.


DISCUSSION PWO CRYSTALS AND TESTING

  • The CD3A scope includes 1069 crystals
  • The first articles (110 crystals) have been shipped and are en route to JLab - acceptance tests will be done there
  • After acceptance of the first articles regular monthly shipments of at least 70 crystals/month will commence
  • Discussion about crystal storage
  • NPS cleanroom capacity: currently can store an additional ~600 crystals
  • There may be additional storage space at JLab - need to investigate
  • Crystal test benches
  • UKY and JMU have been setting up test benches for crystal tests. Both have one PWO crystal that can be used for cross checking.
  • Expect to be ready to exercise crystal test procedures soon
  • Actions
  • Investigate crystal storage space at JLab
  • Send one crystal each to Larry and Justin for SiPM board tests


BEAM TESTS AT DESY

  • March beam test will commence on 3/24. Goals are:
  • Run Crytur system
  • Measure energy resolution with MIT 5x5 prototype with SiPM readout
  • Direct comparison of two channels with SiPM
  • Possibly insert a glass block in the central position
  • Analysis of the data from February
  • HCROC data are being analyzed at Orsay including pedestal and width fluctuations and noisy channels. Expect initial results to the expert group in ~3 weeks
  • discrete data are being analyzed at OU. Planning to present status early next week and implement any feedback.


FINAL DESIGN REVIEW PLANNING

  • Presently planned for May 2025
  • The main item to be reviewed is the mechanical design - 90% level
  • Requires information from the beam test on the readout chains. If decision on the readout chain is made in ~2 weeks then still requires implementation into the mechanical model. May 2025 may still be possible, but it is very tight.


NEXT MEETING: FRIDAY 4 APRIL AT 8:00AM ET