General Meeting Summary 1/17/19
Jump to navigation
Jump to search
NPS COLLABORATION MEETING - 1 FEBRUARY
- Discussion draft agenda
- reduce talk time
- leave breaks - need ~1hour for lunch
- Discussion presentation template for ERR related talks
EXPERIMENT READINESS REVIEW (ERR)
- Discussion of draft charge
- Items that need more detailed discussion are points 4, 5, 7, 8, and 9
- Point 4: define pieces and responsibilities
- Point 7: need generated radiation levels, submit preliminary radiation assessment documentation?
- Point 8: Readiness for calorimeter analysis
- Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible
- Action items:
- Have preliminary drafts of documentation
- Prepare task list for 1 Feb collaboration meeting
- ERR dates - send suggestions for dates in frame March-April to Patrizia
MAGNET UPDATE (Bogdan)
- Magnet ready, water lines have been connected
- Power supply - plan s to energize within next week
FRAME UPDATE (Carlos)
- Good progress on assembly of modules (2 x 2)
- improved assembly/disassembly mechanics and procedure, e.g. captive screw that will stay attached to the frame and not fall when trying to disassemble
- still looking into some details of attaching fiber, e.g. glue to either crystal or frame
- Design of PCB boards is complete and ready for production
- LEDs on board, short fiber to crystal, control LED by flat cables
- signal connectors are one end SMA (similar size to LEMO, but more complicated to plug in/out) and LEMO on other end
- HV connectors are Ficher (smaller than regular SHV)
- Access to PMTs improved
- boards slide like curtain to left/right - can almost access PMTs by hand from the back, but might need to optimize distance
- Cooling
- chilled plates around calorimeter crystals
- cooled air in space between crystal and PCB - this space is crowded with many cables, poor air flow - difficult to cool
- Temperature gradient crystals
- will have probes in the box to measure temperature
- discussing fan performance with vendor
- isolation from room - boundary condition air
- Time frame - start construction in second half of the year and finish early next year.
- Funds availability - will confirm on 1 Feb
CRYSTALS (Vladimir)
- Completed visual inspection of ~90% of first batch of CRYTUR crystals
- NO rejections
- Planning to measure tolerances for frame in next weeks
- Crystal lengths are same for SICCAS and CRYTUR, but area slightly different
- Action Item: make matrix where Crytur and SICCAS crystals would go - send numbers to Hamlet
- Prototype: commissioning complete, will present preliminary results at collaboration meeting
NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY