General Meeting Summary 5/2/19

From Cuawiki
Revision as of 14:15, 2 May 2019 by Hornt (talk | contribs)
Jump to navigation Jump to search

DISCUSSION OF DRAFT TALKS

TANJA

  • Add experimental techniques for both sets of experiments
  • Under General requirements: add electron beam energies (p.3) and statement that two separate configurations (SHMS right for angles below 23 deg and SHMS left) are needed (p.4)


STEVE W.

  • Input on exact number of crystals (Tanja)
  • Refer to Carlo's talk for discussion of frame and amplifiers including results from recent beam tests
  • plan for frame delivery is summer 2020
  • Time frame for detector placement and cabling - estimate is ~one month based on Hall A DVCS experience
  • High level software - list INP-Orsay
  • Radiator - same as for J/Psi, follow up with target group on details


STEVE L.

  • Change "patch panel #1" to something like "cable support"
  • Plan for transition from SHMS right to SHMS left configuration in backup
  • Clarify spectrometer support group time, e.g. 100% available
  • Ready to put slides into ERR specific template as needed


CHARLES

  • Working on final slides - plan is to include further detail on: 1) plan for mapping and running and 2) safety and operation


CARLOS

  • Working on final slides
  • Input on exact number of crystals (Tanja)


BRAD S.

  • Working on final slides
  • Slow controls and LED subsystems - follow up with Carlos and Julie
  • Communications with fast electronics group ongoing


JAY

  • No changes to slides


GABRIEL

  • Add specifics for neutral particles: photon, neutral pion